Lenox® Lockers (includes Cubby & “Z” Lockers)
Installation
6
10/24/07
Bradley Corporation • LK-INSTR-001 Rev. K; EN 07-1303
Installation Instructions continued . . .
Step 3: Locker Installation
NOTE: Refer to your submittal layouts for proper locker position. The first locker is usually installed
at a corner or at the end of a run.
IMPORTANT NOTE FOR STANDARD LOCKERS: Make sure each locker is square AND level
before securing into place (the lockers may be square but not level so be sure to check
both). Use shims as needed.
1. Position the first locker according to your submittal layouts. Square and plumb the locker using
shims as required. Secure the locker to the wall in two places with the two 1/4" x 1-3/4" Lg.
Tapcon screws. With the screws centered across the width of the locker, place one near the top
and one near the bottom as shown in Figure 3.
2. Position the second locker next to the first locker. STANDARD LOCKERS ONLY: Square and
plumb the locker using shims (as required) to align the tops and fronts.
IMPORTANT: Lockers must be installed flush with adjacent lockers.
3. Temporarily clamp the lockers together at the top and bottom. Drill four 9/32" clearance holes
through locker as shown in Figure 3. The holes should be located 1-1/2" from the front of the
locker and evenly spaced, top to bottom. Fasten lockers to each other using the #10-24 male and
#10-24 x 3/4" female sex bolts provided.
4. Position additional lockers according to your submittal layouts. Square and plumb each locker
using shims as required. Fasten lockers to each other using the #10-24 male and #10-24 x 3/4"
female sex bolts provided.
5. Secure each locker to the wall in two places with the appropriate wall installation hardware
provided. Use two 1/4" x 1-3/4" Lg. Tapcon screws, placing one near the top and one near the
bottom of the locker as shown in Figure 3.
Figure 3
DRILL 3/16" DIA.
PILOT HOLE IN
CONCRETE OR
BLOCK WALL
DRILL 9/32" DIA.
CLEARANCE
HOLE THROUGH
BACK OF LOCKER
FILLER
CENTERLINE
OF LOCKER
BACK