background image

8

Install Guide - SleekWall

STEP-BY-STEP 

GUIDE

PALING CHANNEL 

INSTALLATION

STEP 3

 - 

FITTING PALING CHANNELS

If your channels are not the desired length then these will need to be cut, ideally with a drop saw to 

obtain a nice clean cut with out heating the aluminium to a point that it burns the powder coating.

With the use of a tape measure, string line/chalk line or if you have access to a laser level you can 

mark the heights of the top of your slat channel on your posts.

 

NOTE -

 If your site has a sloping ground, it may be required that you step your fence from bay to bay. 

Once a height has been established for all your channels, with the tek screws supplied, screw your 

channel directly to your post whilst keeping the top of your channel to the marks you have made on 

your post.

Your screws should be approximately 300-400mm apart down the length of your channel.

Make sure the post is elevated 10mm 
higher than the channel to allow for a 
post cap

!

IMPORTANT

The paling channel is asymmetrical, to 

ensure your fence aesthetically looks 

correct, make sure the “screw port 

side” is all facing the same direction 

(Generally on the inside of your 

property looks best).

!

IMPORTANT

Paling Cavity

Paling 
Screw 
Port

Cover Clip

Summary of Contents for SLEEKWALL SOLID

Page 1: ...SLEEKWALL SOLID A STEP BY STEP GUIDE TO INSTALLING YOUR FENCE INSTALL GUIDE...

Page 2: ...DTHIS TOOLS LIST It is recommended that the reader pays particular attention to those items identified as IMPORTANT in this manual to ensure satisfactory long term performance IMPORTANT the table in S...

Page 3: ...items are not included but one type of post and cap are required for installation 145 x 16 x 1780mm TGV PALING 30 x 30 PALING CHANNEL CHANNEL COVER CLIP CHANNEL ENDS CAPS LEFT RIGHT TEK SCREWS 65 x 6...

Page 4: ...r posthole centres using the table below as a guide and mark out your posthole positions on the ground with line marking paint NOTE Postholes can be dug by hand or with a mechanical auger Use the foot...

Page 5: ...imber posts ot concrete blocks etc TGV Paling Length 65 x 65 Post Hole Centres In between Post Measurements 1780mm Paling 1865mm 1800mm Wall Height Hole Depth into Firm Earth or Clay 900mm 450mm 1200m...

Page 6: ...e concrete is being poured Avoid using quick setting concrete as it can be corrosive to aluminium posts IMPORTANT Allow 75mm min from edge of post to edge of ground Slop top of concrete away from post...

Page 7: ...same principal of the gap between a string line and the posts works for both in ground and flanged posts this will ensure a straight line of posts Refer to page 6 for a diagram of this Refer to the ta...

Page 8: ...round it may be required that you step your fence from bay to bay Once a height has been established for all your channels with the tek screws supplied screw your channel directly to your post whilst...

Page 9: ...hey are all stacked Then place the tongue cover over the last paling and screw into place If you are doing a lower height than 1800mm you will need to divide the height of your wall into the number of...

Page 10: ...is to use either a rubber mallet or the rubber handle of your hammer Insert one edge of the cover clip into the channel then with the rubber mallet hammer handle from either the top or bottom Tap the...

Page 11: ...DE CAPPING INSTALLATION STEP 6 FITTING CHANNEL CAPS Once all the palings have been installed we have an optional cap to cover the profile of the slat channel system These consist of a left and right h...

Page 12: ...S Yes we have a 10 year warranty on our products If you are in a coastal zone then an increase of cleaning and maintenance will be required We do not recommend the product to be in direct contact with...

Page 13: ...0800 003 006 boundaryline co nz...

Reviews: