Page 11
STEP 3:
Lift the beam / frame top assembly no less than 20 in. off the ground, move the Crate Bottom away, and then
assemble four Frame Legs. After the Frame Legs
installed and tightened, lower down the Splitter, and allow it standing firmly
on the ground. See FIGURE 6.
REF. NO.
DECSRIPTION
QTY.
4
Frame leg
4
5
Hardware mounted on Frame legs
Including:
5-1
Hex head bolt / M10 x 80
8
5-2
Spring washer / M10
8
5-3
Flat washer / M10
8
5-4
Nut / M10
8
(FIGURE 6)
Page 14
Summary of Contents for 3PT22T25
Page 2: ......
Page 29: ...Page 22 EXPLODED DIAGRAM PARTS LIST Page 25...
Page 32: ...Page 25 Page 28...
Page 34: ...Page 27...
Page 35: ...Page 28...