![Bosch Worcester GREENSTAR 12i System Instruction Manual Download Page 21](http://html.mh-extra.com/html/bosch/worcester-greenstar-12i-system/worcester-greenstar-12i-system_instruction-manual_38669021.webp)
4
7
6
UNPACKING THE APPLIANCE
UNPACKING THE APPLIANCE
A - Outer carton
B - Inner sleeve (unwraps from front)
C - Packaging base
D - Protective wrapping
E - Appliance outer case
F - Protective inner packaging
4
. Remove outer carton (A) and place
safely away from the working area.
5
. With the outer packaging removed and
the inner sleeve (B) still in place gently
lay the boiler on its back.
6
. The boiler will lie at an angle to the
floor to allow the boiler outer casing (E)
to be removed. The inner sleeve (B)
opens as shown. Remove the protective
wrapping (D) and undo the four screws,
two at the bottom of the boiler (H) and
two at the top (H) (see diagrams 6.1 and
6.2). Remove any packaging within the
boiler and the packaging base (C).
7
. Stand boiler upright and remove the
protective inner packaging (F) at the rear
of the boiler.
UNPACKING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
8 716 107 375a (02/05)
20
IN
ST
AL
LA
TI
O
N
A
5
B
C
F
B
C
F
H
H
B
C
D
E
F
F
6.1
6.2
If fitting the optional integral diverter
valve, t he copper pipe wit hin t he kit
should be fit t ed t o t he boiler before
hanging on the wall mounting frame.
See “OPTIONAL DIVE RTE R VALVE”
Sect ion in t hese inst ruct ions or t he
instructions supplied with the optional
diverter valve kit.