![Bosch Worcester GREENSTAR 12i System Instruction Manual Download Page 16](http://html.mh-extra.com/html/bosch/worcester-greenstar-12i-system/worcester-greenstar-12i-system_instruction-manual_38669016.webp)
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22mm compression fittings
Gas:
22mm compression fittings
Use the fittings supplied in the Lit/Hardware
pack.
• If the boiler pipes are to be run behind the
appliance ensure that the pipes pass through
the slot in the yellow plastic guide (A). This is
fitted to the boiler frame.
Return 22mm
Flow 22mm
PLUMBING MANIFOLD
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
8 716 107 375a (02/05)
15
P
R
E -
IN
ST
AL
LA
TI
O
N
Gas Supply (alternative from above appliance) 22mm
Mains Gas Supply 22mm
A
Further guidance on pipe routing can be
found printed on the boiler template
(supplied with the boiler).
IMPORTANT: IF FITTING OPTIONAL
INTEGRAL DIVERTER VALVE
Disregard t his page and refer t o t he
correct version for installing the integral
divert er valve in t he ADDITIONAL
INFORMATION section at the back of this
book.
Return 22mm
Flow 22mm