Bearing time / months
Measures for commissioning
> 1
> 12
> 60
■
Exchange bearings
■
Exchange encoders
Tab. 5-1:
Measures before commissioning motors that have been stored over
a prolonged period of time
Cables and Connectors
Bearing time / months
Measures for commissioning
> 1
> 12
> 60
■
■
■
Visual inspection of all parts to be damage-free
■
■
Check the electric contacts to verify that they are free from
corrosion
■
Visually inspect the cable jacket. Do not use the cable if
you detect any abnormalities (squeezed or kinked spots,
color deviations, ...).
Tab. 5-2:
Measure before commissioning cables and connectors that have
been stored over a prolonged period of time
MSK Synchronous Servomotors
17/57
Transport and storage
R911325169_Edition 03 Bosch Rexroth AG
Summary of Contents for rexroth MSK 030
Page 1: ...MSK Synchronous Servomotors Operating Instructions R911325169 Edition 03 ...
Page 20: ...6 57 MSK Synchronous Servomotors Bosch Rexroth AG R911325169_Edition 03 ...
Page 22: ...8 57 MSK Synchronous Servomotors Bosch Rexroth AG R911325169_Edition 03 ...
Page 32: ...18 57 MSK Synchronous Servomotors Bosch Rexroth AG R911325169_Edition 03 ...
Page 69: ...Notes MSK Synchronous Servomotors 55 57 ...
Page 70: ...Notes 56 57 MSK Synchronous Servomotors ...