Assembly 25/56
3 842 558 372/2021-10, MIT: EL 2,
Bosch Rexroth AG
Fig. 13: Installing the
SW13
Ø 8
73
M = 25 Nm
D
3 842 528 718
3 842 146 815
3 842 526 560
7.1
7.2
3 842 345 081
558 371-05
lift EL 2 (3/4)
7.
Screw the belt section
and the lifts to the fl oor.
For each connection,
you will need:
– 1x foundation bracket,
3 842 146 815
– 1x dowel,
3 842 526 560
– 2x T-bolts,
3 842 528 718
– 2x fl ange nuts,
3 842 345 081
EN
GLISH