
576414 | REV. B | 28.10.2016
Bosch Automotive Service Solutions Inc.
Power Xpress™ Dual Bollard Charge Station Installation Guide
|
3
|
en
3.0 Tools Suggested for
Installation (Not Provided)
4.0 Materials Required for
Installation
5.0 Applicable Electrical
Systems
IMPORTANT: The onsite service connection
must be properly identified
before installation of the EVSE.
If you are unsure of the available
service connection, consult
the local utility company or
contact Bosch Electric Vehicle
Solutions at 1-877-805-EVSE
(3873).
NOTE: The L1, L2, and Ground outputs (H, N for Eu-
rope) in the following illustrations correspond to
the inputs on the
EVSE
.
NOTE: For the (earth) ground connection, always con-
nect the neutral at the service panel to earth
ground. Ground fault protection is not possible
unless the neutral (center tap on the service
transformer) is connected to an earth ground.
5.1
220/240V Single Phase (North
America)
NEUTRAL
(NOT USED)
120V
120V
L2
L1
240V
220/240V Single Phase
WARNING: The EVSE is a single-phase
device. Do not connect all three phases
of a 3-phase feed. Only three wires are
connected, take care that the service
transformer secondary connection is
known, and the three wires from the
main-panel circuit breaker are correctly
connected and labeled.
5.2 208V 3-Phase Wye Connection (North
America)
Any two of the legs can be used to provide 208V to the
EVSE
with a Wye-connected secondary. For example, L1
and L2, or L1 and L3, or L2 and L3. Reference the wiring
diagram below.
L3
(NOT USED)
120V
NEUTRAL
(NOT USED)
120V
L1
L2
GND
Summary of Contents for Power Xpress
Page 18: ......