
CONTACT US FOR A QUOTE TODAY
1-800-731-1722
WWW.IDEALSHIELD.COM
18
Power Xpress™ Dual Bollard Charge Station
Installation Guide
576414 Rev. A
1.
Pass the charging cable through the exit hole
on the side of the bollard.
2. Feed the cord past the side of the EVSE and
slide into position.
A. EVSE
B. Top Unit
Figure 19. Installation of Top Unit
3.
Install cord into top wiring chamber of the top
unit.
www.pluginnow.com
POWER
STATUS
RESET
Technical Support
# 1 877 809-3873
www.pluginnow.com
POWER
STATUS
RESET
Technical Support
# 1 877 809-3873
Figure 20. Wires Installed into EVSE
1.
Tighten fasteners on the back of the bollard.
2. While tightening the fasteners guide the
EVSE’s so that the bottom cover is resting on
the ledge of the bollard.
NOTE: The fasteners will force the EVSE’s snuggly
against the bollard..
Figure 21. Secure EVSE Units
1.
Position the strain relief at the bottom of the
side slot metal mounting bracket in the steel
bollard. Position such that the rubber grommet
(D) seats on the opening of the lower plastic
bollard cover. Repeat on opposite side.