Making the electrical connections
|
45
6 720 806 992 (2015/03)
Greenstar
Ø 3" / Ø 5" (Ø 80/125 mm) Concentric venting system
The maximum concentric pipe length (
tab. 23) depends on the
installation situation, the appliance type and the number of elbows used.
Example:
• Model:
ZBR28-3A
• 90 ° elbows used:
2
• 45 ° elbows used:
2
Maximum straight vent pipe allowed:
38ft (11.6 m)
6.9
Testing gas and water connections for leaks
Water connections
▶ Open the heating supply and return valves and fill the heating system.
▶ Check all connections for leakage (test pressure: Max. 30 psi (2.07
bar) on the pressure gauge).
Gas line
▶ Close the gas shutoff valve to protect the gas valve from damage.
▶ Check all connections for leakage (test pressure: Max. 60" W.C. (150 mbar)).
▶ Release pressure.
7
Making the electrical connections
7.1
General notes
Electrical components must be installed by a trained and certified
electrician and the installation must meet the National Electric Code as
well as all applicable local codes and regulations.
The boiler must be properly electrically grounded in accordance with the
requirements of the authority having jurisdiction or, in the absence of
such requirements with the National Electrical Code, ANSI/NFPA 70
and/or the Canadian Electrical Code Part I, CSA C221.1, Electrical
Code.
Installations
Fig. 35 Stainless steel wall termination
2" PIPE
Maximum straight vent pipe length allowed
for Ø 2" pipe
Number of 90 °
elbows used
ZBR16-3A
ZBR21-3A
ZBR28-3A
ZWB28-3A
ZBR35-3A
ZWB35-3A
ZBR42-3A
ZWB42-3A
1
76 ft (23.1 m)
60 ft (18.3 m)
2
71 ft (21.6 m)
52 ft (15.9 m)
3
66 ft (20.1 m)
43 ft (13.1 m)
4
61 ft (18.6 m)
35 ft (10.7 m)
5
56 ft (17.1 m)
27 ft (8.2 m)
6
51 ft (15.6 m)
18 ft (5.5 m)
Table 21 Vent and combustion air pipe lengths with 2" diameter and the
stainless steel wall termination
Installations
Fig. 38 Concentric termination
2" PIPE
Maximum straight vent pipe length allowed for
Ø 2" pipe
Number of 90 °
elbows used
ZBR16-3A
ZBR21-3A
ZBR28-3A
ZWB28-3A
ZBR35-3A
ZWB35-3A
ZBR42-3A
ZWB42-3A
1
66 ft (20.1 m)
47 ft (14.3 m)
2
61 ft (18.6 m)
38 ft (11.6 m)
3
56 ft (17.1 m)
30 ft (9.1 m)
4
51 ft (15.6 m)
22 ft (6.7 m)
5
46 ft (14.1 m)
13 ft (4.0 m)
6
41 ft (12.5 m)
5 ft (1.5 m)
Table 22 Vent and combustion air pipe lengths with 2" diameter and the
concentric termination
Installations
Fig. 41
Ø 3" / Ø 5" (Ø 80/
125 mm)
CONCENTRIC PIPE
Maximum straight vent pipe length allowed
for Ø 3" / Ø 5" (Ø 80/125 mm) concentric pipe
Number of 90 °
elbows used
ZBR16-3A
ZBR21-3A
ZBR28-3A
ZWB28-3A
ZBR35-3A
ZWB35-3A
ZBR42-3A
ZWB42-3A
1
50 ft (15.2 m)
44 ft (13.4 m)
2
44 ft (13.4 m)
38 ft (11.6 m)
3
38 ft (11.6 m)
32 ft (9.8 m)
4
32 ft (9.8 m)
26 ft (7.9 m)
5
26 ft (7.9 m)
20 ft (6.1 m)
6
20 ft (6.1 m)
14 ft (4.3 m)
Table 23 Pipe lengths with Ø 3" / Ø 5" (Ø 80/125 mm) diameter and
termination
Fitting
Equivalent
ft
m
45 ° elbow
3
0.91
90 ° elbow
6
1.82
Table 24 Concentric pipe friction loss equivalent for fittings
NOTICE:
System damage!
Pressure, control and safety equipment may be
damaged by excessive pressure.
▶ When you carry out a leakage test, make sure that no
pressure, control or safety equipment is installed that
cannot be isolated from the test pressure.
▶ The boiler and its dedicated shutoff valve must be
disconnected from the gas supply piping system
during any pressure testing of that system at test
pressures in excess of 14" W.C. (35 mbar).
DANGER:
Risk of electric shock!
▶ Before working on the power supply (120 VAC),
disconnect the boiler from the grid by shutting off the
emergency shutoff switch or disengaging the heating
system circuit breaker. Take measures to prevent
accidental reconnection.
▶ It is not sufficient to simply shut off the controls.
▶ Observe all applicable electrical codes and
regulations.
Summary of Contents for Greenstar
Page 102: ...102 Index Greenstar 6 720 806 992 2015 03 ...
Page 103: ...Index 103 6 720 806 992 2015 03 Greenstar ...
Page 104: ......