Commissioning (contractors only)
4
Commissioning (contractors only)
For correct commissioning, it is essential that the
following steps are carried out in the order
shown.
1.
Set the DIP switch on IPM 1 and IPM 2 in
accordance with the details in the instruc-
tions supplied.
2.
Switch the system ON.
3.
Program additional room temperature cont-
rollers FR 10 (not permissible in Germany)
or FR 120 in accordance with the details in
the manual supplied.
4.
When commissioning for the first time or
after a complete reset (all settings have
been reset), you need to select the display
language:
–
Turn
to select the language and
press
to confirm. (For how to
change the language
Æ
chapter 6.4.4 on
page 37.)
5.
If the power reserve has run out, set the time
and date as follows:
–
Turn
to select the hour and press
to confirm.
–
Turn
to select the minutes and
press
to
confirm.
–
Turn
to select the year and press
to confirm.
–
Turn
to select the month and press
to confirm.
–
Turn
to select the day and press
to confirm. (For how to change the
date and time
Æ
chapter 6.4.1 on
page 37.)
6.
Set the code for the heating circuit (only
FR 120 with BUS connection)
–
If the controller is to control heating cir-
cuit HC
1
and DHW heating:
Identification
CH circuit
select code 1 with
and
confirm with
.
–
If the controller is to control heating cir-
cuit HC
2...10
:
Identification CH circuit
with
select a code between 2 and 10and con-
firm with
.
7.
During commissioning, automatic system
configuration starts immediately after entry
of the date and time.
–
Wait for 60 seconds and then follow the
instructions displayed.
–
If automatic system configuration does
not start of its own accord, start it from
the menu
Æ
chapter 8.2 on page 45.
8.
Switch off automatic
Auto switch between
GMT - BST
Æ
chapter 6.4.1 from page 37
9.
Adjust other settings to suit the current sys-
tem,
Æ
chapter 6 starting on page 28 and
chapter 8 starting on page 42.
10. Fill and vent the solar thermal system accor-
ding to its documentation and prepare it for
commissioning as described in chapter 8.4
on page 47.
11. Adjust other settings to suit the current solar
thermal system,
Æ
chapter 8.5 starting on
page 47.
12. Commission the solar thermal system,
Æ
chapter 8.5.1 on page 48.
For each heating circuit, only one
FR 10 or FR 120 can be assigned
per code.
The functions of the controls and
the meanings of the symbols on the
display are explained on pages 2
and 3.