6 | Wiring Harness instruction / Build up chassis
58 / 60
e-GoKart_Powertrain__Young_Star__Manual
Bosch Motorsport
Illustration 70:
Components fixed metal sheet
6.2 Vehicle Control Unit VCU MS 40
At the end of the wiring harness implementation, the Vehicle Control Unit VCU MS 40 can
be fixed on the black box. Please use M3 screws with a washer and Loctite.