Installation Manual
Bosch Climate 5000 AA Series Inverter Multi Split-Type Ductless Air Conditioner / Heat Pump
| 21
Bosch Thermotechnology Corp.
|
01.2017
Data subject to change
9.3 Safety And Leakage Check
Electrical safety check
Perform the electrical safety check after completing installation. Cover the following
areas:
1.
Insulated resistance The insulated resistance must be more than 2MΩ.
2.
Grounding work After fi nishing grounding work, measure the grounding
resistance by visual detection and using the grounding resistance tester. Make
sure the grounding resistance is less than 4Ω.
3.
Electrical leakage check (performing during test while unit is on) During a test
operation after completed installation, use the electroprobe and multimeter
to perform an electrical leakage check. Turn off the unit immediately if leakage
happens. Try and evaluate diff erent solutions until the unit operates properly.
Gas leak check
1.
Soap and Water Method
: Using a soft brush, apply soapy water or liquid
detergent to all pipe connection points on the indoor unit and outdoor unit.
The presence of bubbles indicates a leak.
2.
Leak Detector Method:
If using leak detector, refer to the device’s operation
manual for proper usage instructions.
Indoor unit
check point
Outdoor
unit
check
point
A, B,C,D are points for the one-four type.
A, B,C,D, and E are points for the one-five type.
Figure 25
The illustration is for example purposes only. The actual order of A, B, C,
D, and E on the machine may be slightly diff erent from the unit you
purchased but the general shape will remain the same.