![background image](http://html.mh-extra.com/html/bosch/bva-2-0-series/bva-2-0-series_installation-instructions-manual_17947012.webp)
1 2 |
Bosch IDS BVA 2.0
Installation Instructions
02.2019
|
Bosch Thermotechnology Corp.
Data subject to change
Figure 12
A
1:4
A
RAILS
RAILS
DETAIL A
ENSURE THE RETAINING
CHANNEL IS FULLY ENGAGED
WITH THE COIL RAIL.
AIRFLOW
AIRFLOW
Vertical Down
fl
ow & Horizontal Left Applications
NOTICE:
Horizontal units must be configured for right hand air supply
or left hand air supply. Horizontal drain pan must be located
under indoor coil. Failure to use the drain pan can result in
property damage.
Conversion in Horizontal Direction:
Horizontal right-hand supply can be changed to horizontal left-hand supply by
removing the indoor coil and reinstalling 180° from original.
3.4 Installation in an Unconditioned Space
NOTICE:
There are two pairs of coil rails in the air handler for upflow
and downfl ow application. If the air handler is installed in
an unconditioned space, the two unused coil rails should be
removed to minimize air handler surface sweating. The coil
rails can be easily removed by unscrewing the 6 mounting
screws from both sides of the cabinet.