
1 689 978 505
2010-09-23
|
Robert Bosch GmbH
16 | 1 687 001 866 / 1 682 666 309 | Start-up
en
3.
Start-up
i
The country-specific settings for the AMM are set
automatically by the BEA system software after
switching on the BEA.
After fitting, the AMM must be re-adjusted and the
maintenance date set. The functions can be imple-
mented with both the BEA system software and the
service software and are described in the following.
3.1
Installing the system software
¶
Prior to start-up, install the system software, which
supports the Andros measuring chamber. Infer the
version from the document " Gesamtübersicht aller
Software-Versionen" in EDIS.
ESA x.xx UK
R
BEA 050
R
BEA 450
R
BEA 840/850
R
ESA 3.240/3.250
BEA x.xx UK
R
BEA 250/350
3.2
Interfaces
¶
Set the interfaces. Refer to the installation instruc-
tions (1 689 978 427) and Section 12 of the program
description (1 689 979 659).
3.3
Start-up with BEA system software
i
The BEA must be at the corresponding operating
temperature for start-up; this is attained
approx. 5 min. after switch-on.
3.3.1
Re-adjusting the AMM
Entry of set values
1.
Switch on the BEA.
2.
Select "
Main menu >> Configuration
" (
uo
) and con-
firm with
V
or
E
.
3.
Select "
Petrol config. >> Readjustment
" (
uo
) and
confirm with
V
or
E
.
i
activates set value input. Numerical values must
be entered separated by a dot.
4.
Enter the set values for the certified gas bottle.