15
BASE AND TOE PANEL (Continued)
Plastic Base Access Panel and Toe Panel Installation
(SHY66C, SHX99A, SHE66C, SHE99C, SHX57C, and
SHV57C models only)
1
Place the Plastic Base Access Panel under and up the
front bottom panel of the dishwasher, as shown in
Figure 34a
.
2
Insert the Plastic Base Access Panel screws into the
Plastic Base Access Panel, as shown in
Figure 34b
.
Tighten the Plastic Base Access Panel Screws.
3
Place the Cotton Insulation Strip under the unit,
between the bottom of the Plastic Base Access Panel
and the floor, as shown in
Figure 34c
.
4
Attach the Toe Panel to the Plastic Base Access Panel
using the Toe Panel Screws included in the Toe Panel
Installation Kit. See
Figure 34d
.
NOTE:
You will not use the normal Toe Panel Screws
included in the Dishwasher Installation Kit on these
models.
Figure 34
a
b
d
c
Base and Toe Panel/ Final Instructions
In some conditions, Hydrogen gas can form in a
hot water system that has not been used for
weeks. Hydrogen gas is explosive. Before filling
a dishwasher from a system that has been off for
weeks, run the water from a nearby faucet in a
well ventilated area until there is no sound or
evidence of gas.
FINAL INSTRUCTIONS
1
Energize the dishwasher power supply circuit.
2
Consult the Dishwasher Use and Care Manual, and run
the dishwasher through one complete cycle. If the
dishwasher does not operate properly, refer to the Self-
Help section of the Use and Care Manual. If the
dishwasher still does not operate properly, refer to the
Customer Service Section of the Use and Care
Manual.
WARNING
Summary of Contents for 8504
Page 2: ......
Page 51: ...17 Notes ...
Page 52: ...18 Notes ...
Page 53: ...19 Notes ...
Page 54: ...20 90 00 06 37 16 8504 BSH Home Appliances Corporation 2005 Litho U S A 07 04 ...