Transport
|
27
6 720 820 733 (2017/09)
W 500-5X... | W 750-5X... | W 1000-5X...
4
Transport
A crane is appropriate for transport. Alternatively the cylinder can be
transported using a pallet truck or forklift truck.
▶ Transport the cylinder with a pallet truck, forklift truck (all) or with a
crane (750/1000 litres unpackaged) (
5
Installation
▶ Check that the DHW cylinder is complete and undamaged.
5.1
Installation location
If there is a danger that water may collect on the floor of the installation
site:
▶ Place DHW cylinder on a plinth.
▶ Position the DHW cylinder in dry internal areas that are free from the
risk of frost.
▶ Observe the minimum room height (
minimum wall clearances in the installation location
(
5.2
Positioning the DHW cylinder, fitting the thermal
insulation
500 litre cylinder (
▶ Remove packaging.
▶ Remove casing lid and top insulation.
▶ Remove thermal insulation (ErP “B”) or foil jacket (ErP “C”) and store
provisionally.
▶ Unscrew the cylinder from the pallet.
▶ Optional: fit the adjustable feet (accessory).
▶ Position and align the cylinder.
▶ Fitting the thermal insulation
– ErP “B”: establish hydraulic connection, fit separate thermal
insulation. Close with Velcro fastener.
– ErP “C”: fit foil jacket. Close the zipper.
▶ Place the top insulation and casing lid on.
▶ Attach the front hand-hole cover.
▶ Remove the cap.
▶ Attach Teflon tape or thread.
750/1000 litre cylinder (
▶ Remove packaging.
▶ Provisionally store bag with accessories and floor insulation panel.
▶ Remove casing lid and top insulation.
▶ Provisionally store thermal insulation:
– ErP “B”: separately packaged polystyrene jacket.
– ErP “C”: remove foil jacket.
▶ Remove fixing straps.
▶ Pull off the PU rigid foam halves.
▶ Unscrew cylinder from the pallet.
▶ Lift the cylinder off the pallet.
▶ Optional: fit the adjustable feet (accessory).
▶ Position and align the cylinder.
▶ Attach floor insulation panel, paying attention to the slots for the feet.
▶ Fitting the thermal insulation
– Fit PU rigid foam half-shells, draw together using a ratchet strap,
tap. Fit fixing straps. Remove ratchet strap.
– ErP “B”: fit fleece strip round the connector pipes and attach
fleece circular blank for the cover and push in firmly. Make a hole
for the connector in the polystyrene jacket by cutting round the
perforation with a cutter knife. Fold down top layer, unroll to the
right. Pay attention to the position of the connector. Close Velcro
fastener
– ErP “C”: fit foil jacket, pull zipper shut
▶ Place the top insulation and casing lid on.
▶ Mount logo.
▶ Attach the front hand-hole cover.
▶ Remove the cap.
▶ Attach Teflon tape or thread.
5.3
Hydraulic connection
5.3.1
Connecting the DHW cylinder on the water side
System example with all recommended valves and stopcocks
(
▶ Use installation material that is temperature-resistant up to 160 °C
(320 °F).
▶ Never use open expansion vessels.
DANGER:
Risk to life through falling load.
▶ Only use lifting cables that are in a faultless
condition.
▶ Only insert hooks into the lifting eyes provided.
WARNING:
Risk of injury through carrying heavy loads
and inadequately securing loads for transport!
▶
At least two
persons are required for transportation
and installation.
▶ Use suitable means of transport.
▶ Secure the DHW cylinder against falling.
Applies to 750/1000 litre cylinders:
▶ Remove the foil jacket and rigid foam shells before
transporting (
NOTICE:
System damage due to inadequate load-
bearing capacity of the installation surface or unsuitable
substrate!
▶ Ensure that the installation surface is level and offers
sufficient load-bearing capacity.
NOTICE:
Material damage from a low ambient
temperature.
If the ambient temperature is below 15 °C, the foil jacket
tears while closing the zipper.
▶ Warm the foil jacket (in a warmed-up room) to above
15 °C.
The following applies for the ErP “B” type:
▶ The hydraulic connection can be established before
the thermal insulation is installed.
WARNING:
Risk of fire from soldering and welding!
▶ When soldering or welding, apply suitable protective
measures (e.g. cover the thermal insulation), since
the thermal insulation is combustible.
WARNING:
Risk to health through contaminated water!
Work carried out without due care for cleanliness
contaminates the potable water.
▶ Install and equip the DHW cylinder hygienically in
accordance with national standards and guidelines.
Summary of Contents for 7735500292
Page 77: ...Stavljanje izvan pogona 77 6 720 820 733 2017 09 W 500 5X W 750 5X W 1000 5X ...
Page 78: ...78 Stavljanje izvan pogona W 500 5X W 750 5X W 1000 5X 6 720 820 733 2017 09 ...
Page 79: ...Stavljanje izvan pogona 79 6 720 820 733 2017 09 W 500 5X W 750 5X W 1000 5X ...
Page 80: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...