1 689 989 188
2016-12-20
|
Robert Bosch GmbH
22 | 1 687 010 398 | Product description
en
3.5.3
Fitting mount of supplementary equip
ment set
1.
Use the hexagon socket head bolts M6 x 25 (2x)
to attach the holder in the correct position on the
EPS 200 (Fig. 3, Item 2).
2.
Insert the mount in the holder (Fig. 3, Item 1).
458883-03_Ko
1
2
Fig. 3:
Fitting holder and mount
3.
Attach the mount with the hexagon socket head bolt
M6 x 25 (Fig. 4).
"
This completes fitting of the mount of the supple-
mentary equipment set.
458883-05_Pal
1
2
Fig. 4:
Attaching mount
1 Injection chamber holder
2 Hexagon socket head bolt M6 x 25
3.6
Description of device
3.6.1
Injection chamber, clamping ring, Oring
WARNING – Risk of burns
The hot surfaces at the injection chamber
can cause severe hand burns.
¶
Put on protective gloves before removing
the injection chamber.
During testing, the DHK/UI, CRI/CRIN or CRI Piezo
squirts the test oil into the injection chamber. The test
oil flows back out of the injection chamber via the hose
1 680 712 362 to the DHK/UI flushing connection/test
connection or to the injected fuel quantity test connec-
tion (CRI/CRIN).
458881-02_Ko.eps
1
2
3
Fig. 5:
Injection chamber
1 Quick-release coupling for flushing connection/test connection
2 Injection chamber
3 Knurled nut (for injectors with 7 mm or 9 mm nozzle diameter)