10/19
CH18FT
Made in China to TQB Brands Pty Ltd specifications
P a g e
| 4
Visit us at www.tqbbrands.com.au
Fig 6.
1.
Install table and clamp with bolt (provided)
Fig 7. Head Assembly
1.
Position the head assembly over the column and slide into
position. Align head frame with table base
2.
Fix set screws on right side of head to lock head into
position, tighten screws with allen key
Fig 8. Feeding Handle Installation
1.
Screw knob on each feeding handle, install onto hub of
pinion shaft
Fig 9. Arbor & Chuck Installation
1.
Insert Arbor onto spindle. Pull feed handle down to press
arbor into position
2.
Open chuck jaws completely by turning attached chuck key
counter-clockwise to the end.
3.
Place a piece of wood on the table to protect chuck nose
Fig 10.
1.
Install the chuck to the arbor
and tighten
Fig 11.
1.
Install the knob and screw of
upper pulley cover
Ensure the drill press is firmly fixed in place to table or floor following assembly