BKS Terminal Disinfection Robot Product Manual v1.0
BooCax Robotics
9
/
24
www.boocax.com
②
Turn the direction of knob on
the sprayer base forward, and
then pull out the two connectors
(Terminal 1, Terminal 2 as
shown) at the bottom to match
the male and female connectors
on the chassis. Four dowels are
aligned with the four positioning
holes on the chassis (attention
that the lower charging mouth
of the chassis is also facing
forward)
.
Make it fall smoothly,
buckle in place
→
③
Remove the protective foam
from the water control valve on
the sprayer base to ensure that
the next step of placing tank is
not hindered
Step 3
:
Dock the tank and robot Chassis
Lift the water tank stably,
stack it on top of the
sprayer base. Relying on the
positioning steps that sink
around, it can be freely in
place from top to bottom
under the action of gravity
→
Termi
na
l 2
Power wire
Termi
na
l 1
Signal wire
Four dowels