
n° 6BE648285NI-0606 –
Page 12
3. INSTALLATION
3.1 GENERAL REQUIREMENTS
The installation, any repairs or alterations to this equipment should be undertaken by
qualified specialists.
3.2 HANDLING
The appliance should be moved with specialist lifting gear.
If the unit must be transported it should be on its original pallet and should under no
circumstances be stacked.
3.3 UNPACKING AND LOCATING
3.3.1 UNPACKING
After cutting the banding lift the parts off and identify them from the packing note.
The refrigerated platform is delivered pre connected to the control panel.
3.3.2 LOCATING
Once a location has been chosen ensure that the air around the unit is sufficient to
provide adequate cooling to the condenser and compressor
Allow a 5 to 10cm clearance around the unit.
Avoid proximity to any heat source.
Model shown: 2x1C GI cabinet with 2 doors
Refrigerated platform
Box or accessories
Door frame and door
Back panels
Side panels
Control panel
Wooden pallet