![Bongioanni Multidea Evo 100 Installation And Maintenance Instructions Manual Download Page 27](http://html.mh-extra.com/html/bongioanni/multidea-evo-100/multidea-evo-100_installation-and-maintenance-instructions-manual_2787069027.webp)
b
WARNINGS
•
The pipeline materials must be suitable for use with this type of appliance.
•
The straight pipe sections must be adequately supported and completely free of deformations.
•
The joints must be airtight and self-locking.
TYPE C63 FLUE EXHAUST DUCT AND AIR INTAKE DUCT NOT SUPPLIED BY MANUFACTURER
Type C63 installations must be same as Type C31 using ducts and terminals of a different manufacturer. ALL pipelines
must comply with prEn 1856-1 and the flue lines must be in materials compatible with condensation products.
When dimensioning the ducts, take into account the values of the residual head to the blower.
FLUE TEST KIT
This kit enables simply and quick flue analysis.
205 mm
Multidea Evo
Residual head
(Pa)
Maximum linear length (m)
with pipelines
Ø 80/80
60
117
19
100
348
17
115
270
10,5
CONDENSATE REMOVAL
The condensate drain must comply with current local and/
or national standards.
The condensate drain line must be tightly sealed, with
dimensions suited to those of the syphon and without
any throttled or reduced sections in gradient “i”, which is
recommended at ≥ 3%.
Install a neutralisation device, such as the model supplied
separately on request.
Before commissioning the appliance, fill the syphon with
water.
Plumb in manifolds on the condensate drain and flue
exhaust
eco
Esc
menu
ok
Monday, 24 September 2012
09.37
Condensate
neutraliser
gradient > 3%
Drain
- 27
-
INST
ALLA
TION
Summary of Contents for Multidea Evo 100
Page 62: ...NOTES 62 ...
Page 63: ......