background image

1.

Deflate

the boat (remember

to hold the

valve

insert on the Aerotec

inflatable

floor so that it doesn't

fly off).

2.

Replace

the

valve

protections.

3.

Remove

oars and equipment.

4.

Empty

the boat of all water and sand by opening

the self-bailers,

dry it.

5.

Fold

in

the 2 sides of the main buoyancy

tube (A), fold the cones onto the transom,

then

roll up

the boat around the transom

(C). Start again if you feel there is still some air left in the tubes.

r

i!

1\

Stow

the boat in its bag as follows

(D):

· Stow

the boat folded on its bag open (back side of the bag visible).

· Position

the oars dismantled

on top

· Close

the bag and fasten the two front straps.

· Tight

the side ropes (make sure that all equipment

stays inside).

· To finish,

store the foot-pump

in the front pocket.

Summary of Contents for AEROTEC 380

Page 1: ...Tomo 2 LIRE ATIENTIVEMENT CE MANUEL AVANT MISE EN SERVICE DE VOTRE BOMBARD CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOMBARD LEGGERE ATIENTAMENTE PRIMA DIINIZIARE IL MONTAGGIO DEL VOSTRO BOMBA...

Page 2: ...LUME1 DEALS WITH OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHN...

Page 3: ...rotec floor to correct pressure 5 6 INFLATION I PRESSURE 5 install the seat V ASSEMBLY OF EQUIPMENT _ 6 finish inflation of the boat to the correct pressure INFLATION I PRESSURE A CAUTION Aerotec infl...

Page 4: ...to correct pressure 3 Finish inflation of the tube to correct pressure 4 Tighten the buckles We recommend that you leave the Aerotecfloor in the boat when folding However to clean perfectly the boat...

Page 5: ...flow is feeble but the pump can reach hinll pross 0 To activate the standard valves into INFLATION position Free the valve insert from its protection Unscrew the valve cap Screw the valve support ont...

Page 6: ...ATE THE MAIN TUBE THERE WOULD BE A RISK OF BURST Inflate the main buoyancy tube first with gear lever in position until it becomes difficult to operate then put the gear lever to position and inflate...

Page 7: ...wllllJolll drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN unlil you 1 Flintll lo 1pressure due to the difference in temperatures Therefore a loss of pr ssuH at 1111 ond 01 tile day when...

Page 8: ...the main buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes r i 1 Stow the boat in its bag as...

Page 9: ...2 rue Maurice Mallet 92130 Issy les Moulineaux FRANCE Tel 33 01 41 23 23 23 Fax 33 01 46 48 83 85...

Reviews: