background image

A

WARNING

• CAREFULLY

READ THIS MANUAL

BEFORE

OPERATING

YOUR

BOAT .

• THIS OWNER'S

MANUAL

IS IN TWO VOLUMES

THAT MUST BE

KEPT TOGHETHER.

-VOLUME1

DEALS

WITH

OPERATING

PRECAUTIONS

AND

SAFETY

RECOMMENDATIONS

THAT MUST BE OBSERVED.

- VOLUME

2

DEALS

WITH

TECHNICAL

SPECIFICATIONS

AND

ASSEMBLY

PROCEDURE

OF THE BOAT AND ITS EQUIPMENT.

VOLUME 2

TECHNICAL SPECIFICATIONS

- ASSEMBLY PROCEDURE

4

¢Table of technical specification
¢General description

5

¢Assembly of equipment

I-II

III-IV

V

Summary of Contents for AEROTEC 380

Page 1: ...Tomo 2 LIRE ATIENTIVEMENT CE MANUEL AVANT MISE EN SERVICE DE VOTRE BOMBARD CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOMBARD LEGGERE ATIENTAMENTE PRIMA DIINIZIARE IL MONTAGGIO DEL VOSTRO BOMBA...

Page 2: ...LUME1 DEALS WITH OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHN...

Page 3: ...rotec floor to correct pressure 5 6 INFLATION I PRESSURE 5 install the seat V ASSEMBLY OF EQUIPMENT _ 6 finish inflation of the boat to the correct pressure INFLATION I PRESSURE A CAUTION Aerotec infl...

Page 4: ...to correct pressure 3 Finish inflation of the tube to correct pressure 4 Tighten the buckles We recommend that you leave the Aerotecfloor in the boat when folding However to clean perfectly the boat...

Page 5: ...flow is feeble but the pump can reach hinll pross 0 To activate the standard valves into INFLATION position Free the valve insert from its protection Unscrew the valve cap Screw the valve support ont...

Page 6: ...ATE THE MAIN TUBE THERE WOULD BE A RISK OF BURST Inflate the main buoyancy tube first with gear lever in position until it becomes difficult to operate then put the gear lever to position and inflate...

Page 7: ...wllllJolll drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN unlil you 1 Flintll lo 1pressure due to the difference in temperatures Therefore a loss of pr ssuH at 1111 ond 01 tile day when...

Page 8: ...the main buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes r i 1 Stow the boat in its bag as...

Page 9: ...2 rue Maurice Mallet 92130 Issy les Moulineaux FRANCE Tel 33 01 41 23 23 23 Fax 33 01 46 48 83 85...

Reviews: