background image

We recommend

that you follow the specific

order of the assembly

procedure.

Proceed

step by step

and refer to the corresponding

pages.

PFlOCEDUFli:

PAGE

SECTION

1. inventory

the elements

composing

your boat,

2

CHECK ON UNPACKING

-~.-

...

and learn how to recognise

them

III

IV

DESCRIPTION

2. install the

Aerotec

floor inside the boat

3

ASSEMBLY

-----

3. activate valves

into inflating

position

4

INFLATION SYSTEM

--

..

_--_.

4. inflate the

Aerotec

floor to correct pressure

5

6

INFLATION I PRESSURE

5. install the seat

V

ASSEMBLY OF EQUIPMENT

--_

...

.

....

-~

-

6. finish inflation of the boat to the correct pressure

!)

(;

INFLATION I PRESSURE

A

CAUTION

Aerotec inflatable

air floor

'"

Repair kit

'"

Owner's

manual

*

'"

sllmdard

equipment

-

..

_-_.

Aluminium

paddles

2

Removable

wooden

seat

'"

High pressure

foot pump

'"

Carry bag

1

Removable

bow bag

'"

Fuel tank straps

'"

You can equip

your

boat with

many

optional

accessories

(transportation

wheels,

boarding

ladder,

lifting rings etc.). Ask your dealer to advise you.

IF YOU WISH TO ADD

LIFTING

RINGS,

YOU MUST

FIX THEM

ON THE

BUOYANCY

TUBE,

NEVER ON THE FLOOR

Summary of Contents for AEROTEC 380

Page 1: ...Tomo 2 LIRE ATIENTIVEMENT CE MANUEL AVANT MISE EN SERVICE DE VOTRE BOMBARD CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOMBARD LEGGERE ATIENTAMENTE PRIMA DIINIZIARE IL MONTAGGIO DEL VOSTRO BOMBA...

Page 2: ...LUME1 DEALS WITH OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHN...

Page 3: ...rotec floor to correct pressure 5 6 INFLATION I PRESSURE 5 install the seat V ASSEMBLY OF EQUIPMENT _ 6 finish inflation of the boat to the correct pressure INFLATION I PRESSURE A CAUTION Aerotec infl...

Page 4: ...to correct pressure 3 Finish inflation of the tube to correct pressure 4 Tighten the buckles We recommend that you leave the Aerotecfloor in the boat when folding However to clean perfectly the boat...

Page 5: ...flow is feeble but the pump can reach hinll pross 0 To activate the standard valves into INFLATION position Free the valve insert from its protection Unscrew the valve cap Screw the valve support ont...

Page 6: ...ATE THE MAIN TUBE THERE WOULD BE A RISK OF BURST Inflate the main buoyancy tube first with gear lever in position until it becomes difficult to operate then put the gear lever to position and inflate...

Page 7: ...wllllJolll drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN unlil you 1 Flintll lo 1pressure due to the difference in temperatures Therefore a loss of pr ssuH at 1111 ond 01 tile day when...

Page 8: ...the main buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes r i 1 Stow the boat in its bag as...

Page 9: ...2 rue Maurice Mallet 92130 Issy les Moulineaux FRANCE Tel 33 01 41 23 23 23 Fax 33 01 46 48 83 85...

Reviews: