Operation
BOMAG
20
BT 60/4, BT 65/4
4.1
General notes
Please read section 3 Indicators and Control Ele-
ments thoroughly before operating the machine if
you are not yet fully familiar with the indicators and
control elements of the machine.
All indicators and control elements are described
in detail in this chapter.
4.2
Tests before taking into op-
eration
i
Note
During the running in time the idle speed may in-
crease because of the enhanced moveability of
the engine. Idle speed between 1700 and 2000
rpm.
The running in time of the vibratory tamper is 10
operating hours.
Check
l
condition of engine and machine
l
engine oil level
l
fuel tank and fuel lines for leaks
l
fuel level
l
concertina wall for damage and leaks
l
oil filling of tamper cylinder
l
Visual inspection of machine
Go to
Discount-Equipment.com
to
order your parts