
STEP 3 Cable Assembly
L4
L3
1
L2
L1
Assemble Cable and Pulleys simultaneously.
Route cable from low pulley on right Base Frame (1), up and over top pulley on Right
Top Pulley Assembly (7), down to pulley on Weight Holder (6), up and over top pulley on
Top Pulley Assembly.
Repeat the same procedures for Left Top Pulley Assembly.
6
(29) 3/8" X 1-3/4"
HEX BOLT
(29) 3/8" X 1-3/4"
HEX BOLT
(29) 3/8" X 1-3/4"
HEX BOLT
(30) 3/8" X 1-1/2"
HEX BOLT