
25
32
34
25
31
31
31
31
33
33
33
33
27
27
33
33
35
31
8
11
12
12
9
9
32
34
31
31
31
31
25
25
33
33
33
33
33
33
27
27
33
33
35
35
7
10
12
12
3
3
STEP 2
Top Pulley Assembly and Top Frame Assembly
1. Slide Right and Left Chin - Up Handle (10, 11) onto Top Frame (4). The Downward
angle on each handle should be toward the outside.
2. Attach Right Top Pulley Assembly (7) to Right Upright (3) using one 3/8" X 5/8" Hex
Bolt (31), and one 3/8" Washer (33). Attach Top Frame (4) to Right Top Pulley
Assembly (7) using one 3/8" Washer (33), and one 3/8" X 5/8" Hex Bolt (31).
3. Attach two Tri Link Plates to Top Frame (4) and Chromed Upright (3) using two 3/8" X
3" Hex Bolts (27), four 3/8" Washers (33), and two 3/8" Nylon nuts (35).
Repeat same procedures for the Left Top Pulley Assembly.
Tighten all bolts and nuts.
5