STEP 6 Top Cable Assembly
TOP CABLE (416)
L1
419
416
419
411
430
430
441
438
438
432
L2,L3
441
419
L2
432
438
419
438
441
438
432
406L1
406L2
438
L3
L4
L8
L7
L5,L6
438
438
419
441
438
438
406L1
406L2
432
L6
L5
9
L7
441
419
434
401L
408L
L8
L4
419
417
409
434
441
Assemble cables and pulleys simultaneously.
※
Pulleys are mounted using 3/8" X 3" Hex Bolts (432), 3/8" Washers (438), and 3/8" Nylon Nuts
(441). Pay attention, as some places use washers, others don't.
1. Insert the threaded end of the Top Cable (416) between the pulleys in the front of the Left Cable
Height Adjuster (408L) as shown Fig. L1. Route the cable up and over two top Pulleys at the
Front and Rear of the Top Panel (406) as shown Fig. L2 & L3, then down to the Pulley Bracket
(409) as shown Fig. L4.
2. Continue routing over the two lower pulleys on the Top Panel (Fig L5 & L6) and then down to the
pulley in the welded bracket on the Left Base Frame (402L) as shown in Fig L7. Screw the
threaded end of the Top Cable (416) into the Bracket welded on the Left Cable Height Adjuster
(408L)
AT LEAST
one third of the way. This is a cable adjustment area. When all cables have
been tightened, make sure to secure the Jam Nut to prevent the Top Cable (416) from
unscrewing.