34
S T E P
7
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Wrench tighten ALL hardware at the end of Each Step. Some components may be
pre-assembled. Nylon lock nuts will not fully screw onto bolts, they must be wrench
tighten to fully go on.
7A.
Bend the Right Front Shroud
(WE)
and insert it to the side
slots of the Metal Shrouds
(WB & WC)
.
7B.
Bend the Left Rear Shroud
(WH)
and insert it to the side
slots of the Metal Shrouds
(WB & WC)
.
7C.
Attach Two Top Shrouds
(WG)
to Weight Stack Frames
(WA)
using:
6 - (#11) M6X16mm Phillips Head Screw
6 - (#52) M6 Flat Washer
Summary of Contents for S2FT
Page 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L v S2FT 112216 S2FT ...
Page 21: ...45 21 N o t e s PCL Badge Location ...
Page 23: ...S T E P 1 Above shows Step 1 assembled and completed 23 ...
Page 25: ...S T E P 2 Above shows Step 2 assembled and completed 25 WA WA ...
Page 27: ...27 S T E P 3 Above shows Step 3 assembled and completed WA WA ...
Page 29: ...S T E P 4 Above shows Step 4 assembled and completed 29 ...
Page 31: ...31 S T E P 5 Above shows Step 5 assembled and completed ...
Page 33: ...33 S T E P 6 Above shows Step 6 assembled and completed ...
Page 35: ...35 S T E P 7 Above shows Step 7 assembled and completed ...
Page 36: ...36 S 2 F T E x p l o d e d V i e w ...
Page 37: ...37 S 2 F T E x p l o d e d V i e w C o n t i n u e ...