STEP #3

WIRING THE EMERGENCY BALLAST

>  Select the appropriate wiring diagram to connect the emergency driver to the AC driver and LED load.  

 

Make sure all connections are in accordance with the National Electrical Code and any local regulations.

>  After installation is complete, supply AC power to the emergency driver and join the converter connector.

>  At this point, power should be connected to both the AC driver and the emergency driver, and the Charging  

 

Indicator Light should illuminate indicating the battery is charging.

>  A short-term discharge test may be conducted after the emergency driver has been charged for one hour. Charge    

for 24 hours before conducting a long-term discharge test. Refer to OPERATION.

>  In a readily visible location, attach the label 

"CAUTION - This Unit Has More Than One Power Connection Point. 

To Reduce The Risk Of Electric Shock, Disconnect Both The Branch Circuit-Breakers Or Fuses And Emergency 

Power Supplies Before Servicing."

PUSH TO TEST

INSTALLING THE 2W-ITS ON A BALLAST CHANNEL COVER

>  Drill or punch a 7/8 inch hole in the ballast channel cover. Insert the large 

flanged bushing included with the parts kit. Insert the plastic tube into the 

large flanged bushing. Slide the 2W-ITS tube up or down to adjust the height 

and visibility of the charging indicator light.

>   Slide the plastic tube up or down to adjust the height and visibility of the 

charging indicator light. If the tube is too long, cut the plastic tubing to 

necessary length.

>   After cutting the tube to the proper length, assemble the 2W-ITS.  

To assemble the 2W-ITS Assembly:

•   Feed the 2W-ITS leads through the plastic tubing.

•   Insert the white bushing in the opposite end of tube from the 2W-ITS    

body.

•   Pull switch leads and use provided tie wrap to secure leads snug against 

white bushing.

•   Unscrew hex nut to apply tension to leads.

>   Wire the test switch per wiring diagrams provided on these instructions.

>   If wired correctly, the 2W-ITS indicator light should be ON when AC power is 

supplied to the fixture, and the convertor connector is closed indicating that 

the emergency inverter battery is charging. After installing, mark with the 

"PUSH TO TEST" and "CHARGING INDICATOR LIGHT" labels.

STEP #2b

PUSH TO TEST

Plastic Tube

2 Wire Illuminated Test Switch

Tie Wrap

White

 Bushing

2W-ITS 

Assembly

Components

STEP #2a

INSTALLING THE 2W-ITS ON FIXTURE SURFACE

>   Mount the supplied 2W-ITS (2 wire illuminated test switch) in a location that is 

visible and accessible by maintenance personnel. The 2W-ITS mounts through a 

½” hole which may need to be made in the luminaire or could come pre-punched 

by the luminaire supplier.

>   Wire the test switch per wiring diagrams provided on these instructions.

>   If wired correctly, the 2W-ITS indicator light should be ON when AC power is  

supplied to the fixture, indicating that the emergency inverter battery is  

charging. After installing, mark with the "PUSH TO TEST" and "CHARGING  

INDICATOR LIGHT" labels.

Hex Nut

2 Wire 

Illuminated

Test Switch

Fixture or 

Test/Monitor Plate

Drill or Punch

a 1/2” Hole

Violet

Brown

3

Summary of Contents for BSL310LPST

Page 1: ...e for both factory or field installation For field installation please see the instructions on page 2 6 This product is suitable for use in damp locations where the ambient temperature is 0ºC minimum 55ºC maximum Product is also suitable for installation in sealed and gasketed fixtures Product is not suitable for heated air outlets and wet or hazardous locations Maximum allowable case temp is 65ºC...

Page 2: ...e forward voltage of the luminaire s LED array is within the limits of this emergency LED driver The forward voltage of the LED array is commonly designated as Vf and should be found on the luminaire markings in the luminaire specifications or imprinted directly on the LED arrays If multiple LED arrays are to be driven verify that the total forward voltage is within the limits of this product Usin...

Page 3: ...ube is too long cut the plastic tubing to necessary length After cutting the tube to the proper length assemble the 2W ITS To assemble the 2W ITS Assembly Feed the 2W ITS leads through the plastic tubing Insert the white bushing in the opposite end of tube from the 2W ITS body Pull switch leads and use provided tie wrap to secure leads snug against white bushing Unscrew hex nut to apply tension to...

Page 4: ...ondition has not been corrected by the next scheduled test the unit will once again detect the failure and signal the failure indicator To perform a manual self diagnostic test push and hold 2 wire ITS for minimum of 5 seconds Once 2 wire ITS is released the emergency driver will perform a 5 second diagnostic test During this test unit will monitor the operation of the LED load battery voltage and...

Page 5: ... be charged for at least 24 hours before conducting a long term test NOTE 2 The YELLOW YEL BLK VIOLET BROWN RED and WHITE CONVERTER CONNECTOR wires are all Class 2 Tc 222 25 mm 15 mm TCASE TEST POINT LOCATION AC LED DRIVER WALL SWITCH UNSWITCHED HOT YELLOW COMMON WHITE YEL BLK OUTPUT LED LOAD LED LOAD WHITE WHT BLK WHT RED BLUE OUTPUT BLACK BLACK WHITE GREEN GROUND L E D D R I V E R E M E R G E N ...

Reviews: