Please measure the voltage of contact point to make sure there's no risk of electric
shock before touching any conduct’s surface or metal terminal;
After the Energy Storage System is installed, please clean out the package
material promptly, such as cartons, foam, plastics, nylon ties, etc;
Except the operator, please keep other people away from the Energy Storage
System;
Please use original package or other material to packing the Energy Storage
System for shockproof protection when moving;
All ports of the Energy Storage System must be sealed, and according the
requirement to install the machine;
Forbid to alter ,damage or cover the identification and nameplate of Energy
Storage System;
Please use the suitable tool to lock the screws tightly when installing the Energy
Storage System;
Please fix the Energy Storage System on the group or other stable object(such as
the wall or the frame ) before operating;
Forbid to use water to clean the Energy Storage System or any electronic
components;
Forbid to arbitrarily change or modify the structure
、
the order of install, etc.
1.2.1 Requirement of installation and maintenance personnel
EP600 energy storage system installation
、
electrical connection, test, mainte-
nance, troubleshooting and replace operation must be operated by professional
electrical technician. EP600.
The installation and maintenance personnel must have received professional
1.2 Precaution of installation
Attention
Please attention, it's forbidden to power on EP600 energy storage
system in the process of installation
。
JUST POWER ON
54