17
INSTALLING THE METAL PLATE
• The first metal plate should be placed over the top rail and in the middle of the pool wall joint
(see diagram 25).
• Place the remaining metal top plates on top of the top rail, between the rail joints and aligned with
the metal bottom plates (see diagram 26).
• Place a top ledge over a
metal top plate and attach
using four bolts, washers,
lock washers, and nuts.
• Continue this process until
all of the top ledges are
attached to all of the top
metal plates (see diagrams
27 and 28).
• Check the alignment but
do not tighten.
(Diagram 27)
(Diagram 28)
(Diagram 25)
(Diagram 26)