
STEP 3
STEP 4
Position & Backfill Basin
Place the basin within the hole. Make sure the
pump opening in the grate is orientated near
electrical service. Using a 2 - 4 ft. level ensure
the Fountain Basin remains level side to side.
Once the Fountain Basin is level, carefully back
fill using excavated soil.
Pump Plumbing
Attach 90 degree discharge assembly to Pump.
Attach the Triton 3-way Splitter Valve and hoses to
the discharge assembly. Tighten the hose clamps.
The clear hoses are in fixed lengths of 8’, 7’, and 5’,
with the longest hose going to the tallest fountain.
These lengths correspond to the height of the water
features. The Fountain Pump will be located beneath
the pump access panel and inside the Fountain
Basin. Keep the pump positioned as close to the
opening as possible for best accessibility.
Lay the hose in the basin for now. Consider adding
water to the basin at this time to complete the
stabilization of the basin and save time during the
installation process.
3
3
4
4
Optional Auto Fill Kit Install
If a Blue Thumb Elite
Auto Fill Kit is being
incorporated, you may
bury your water supply
line and make any Auto Fill
connections at this time.
Item: #ABDAUTO