background image

2021-11

1 866 907 0122     blubathworks.com

 2

0

How to clean Stainless Steel

Stainless steels are inherently corrosion resistant materials that do not need additional surface protection to enhance 
their appearance and durability. Some routine maintenance and cleaning is needed to keep stainless steel surfaces in 
good conditions so that the aesthetics appearance and corrosion resistance are not compromised. In this respects, 
stainless steel are no different from other construction materials such as glass, plastic and coated steels, which are never 
maintenance free throughout the life of a building.

Cleaning suggestions:

Mortar and cement splashes can be treated with a solution containing a small amount of phosphoric acid. Rinse with
deionised water and dry.

Iron particles picked up from tools or from structural steels, scaffold-tubing, etc and Steel dust created during
operation such as welding, cutting, drilling must be removed immediately as steel will rust quickly. Beside corroding
themselves, these particles can locally break the self healing “passive film” of stainless steel resulting in pitting in
spite of their normally good corrosion resistance.

Maintenance cleaning special attention should be given to sheltered areas during routine cleaning to ensure
that accumulations of airborne contaminants are removed. This is particularly important in marine and industrial
environments, where build-up of airborne chlorides can result in localised corrosion, if not effectively removed.

Soap water and a mild detergent are usually safe and successful. For more stubborn stains, cream cleansers should
be effective.

Limestone: if cream cleanser is not enough, treat scale with a 25% solution of vinegar and mild hot water and give
it some time to dissolve. Then clean with ( if possible deionised ) mild water and bicarbonate rinse and wipe dry as
usual with care.

To avoid chloride-containing cleansers, especially those containing hydrochloric acids. Hypo-chlorite bleachers: if
applied accidentally or split on stainless steel surfaces, should be immediately rinsed off with liberal amounts of fresh
water; silver cleansers. Not stainless steel wire brushes.

Pitting: at an early stage, light deposits can be removed mechanically using nylon pads, such as “scotch brite“ type
used in the kitchen. If pitting attack has occurred, depending on its severity, acid pickling treatments or mechanical
rectification will be needed to restore the surface. While restoring the corrosion resistance of the surface, picking may
change the surface appearance of the stainless steel. Further mechanical or chemical treatments may be necessary to
restore the original surface finishing.

Precautions:

 It is therefore advisable to avoid contamination, in the first place by either protecting the stainless steel parts, 

whilst other work is being done or by installing them after other operations that could cause contamination have been 
completed. Where water has been used for cleaning or rinsing, wiping the surface dry, to prevent watermarks, especially in 
hard water areas may be advisable. The use of deionised water will prevent the formation of hard water staining.

• Do not use products containing hydrochloric, formic, acetic acids, since they can damage the surface and the product

itself (eg. Viakal)

• Do not over-use products containing phosphoric acid
• It is recommended not to mix different kind of detergents
• Do not use abrasive cleaners or pads.

Summary of Contents for INOX QRI-0030

Page 1: ...INOX wall mount shower rough in valve kit Installation Guide 2021 11 1 866 907 0122 blubathworks com QRI 0001 Pages 4 8 QRI 0030 QRI 0910 Pages 9 15 QRI 0103 x2 Page 16...

Page 2: ...Details Minimum Pressure 15 PSI Maximum Pressure 145 PSI Recommended Pressure 29 72 PSI Maximum Water Temperature 80 C 176 F Maximum Recommended Water Temperature 65 C 149 F the temperature Installat...

Page 3: ...r mix or combine cleaning agents Abrasive cleaners and unsuitable scouring agents such as scouring pads Installation Notes Important Install this product according to the installation guide Our produc...

Page 4: ...water inlet mixed hot water inlet hot water from water tank 1 2 3 3 Component Diagram for QRI 0030 rough in valve kit 1 QRI 0001 single handle hydroprogressive wall rough in valve 2 QRI 0910 thermosta...

Page 5: ...2021 11 1 866 907 0122 blubathworks com 4 Attention Min Max depth in wall QRI 0001 rough in valve...

Page 6: ...2021 11 1 866 907 0122 blubathworks com 5 Attention Placement in wall QRI 0001 rough in valve...

Page 7: ...2021 11 1 866 907 0122 blubathworks com 6 Position Application on plasterboard or counterframe Finish the coating close to the edge of the plastic protective cover QRI 0001 rough in valve...

Page 8: ...2021 11 1 866 907 0122 blubathworks com 7 Installation wall mount single handle with spout configuration VALVE 02 MODO STERO SERIES Universal Position QRI 0001 rough in valve...

Page 9: ...2021 11 1 866 907 0122 blubathworks com 8 QRI 0001...

Page 10: ...Tampering with limit stop in any way may result in scalding temperature causing serious bodily harm and or death Warning Need for Periodic Inspection and Yearly Maintenance Periodic inspection and ye...

Page 11: ...nuts are placed over tailpieces prior to soldering threading to pipe or using w press 6 For valves with Quick Connect tailpieces refer to Quick Connect Installation instructions page 13 NOTICE To prev...

Page 12: ...2021 11 1 866 907 0122 blubathworks com 11 QRI 0910 Thermostatic Mixing Valve...

Page 13: ...he mixed water outlet temperature by placing a thermometer in the mixed water stream 3 To adjust the setting of the valve loosen locking cap screw with hex wrench refer to Figure 3 Cap must be lifted...

Page 14: ...2021 11 1 866 907 0122 blubathworks com 13 QRI 0910 Thermostatic Mixing Valve QUICK CONNECT INSTALLATION...

Page 15: ...2021 11 1 866 907 0122 blubathworks com 14 QRI 0910 Thermostatic Mixing Valve...

Page 16: ...2021 11 1 866 907 0122 blubathworks com 15 QRI 0910...

Page 17: ...1 1 866 907 0122 blubathworks com 16 QRI 0103 Shut Off Valve 1 Body 2 Retainer 3 Ball 4 Check valve insert 5 Stem 6 Gland nut 7 Lever and grip 8 Lever nut 9 O ring 10 Seat 2 12 Stem packing 13 Stem be...

Page 18: ...roprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve cold water in outlet one outlet two cold water inlet mixed hot water inlet...

Page 19: ...andle hydroprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve mixed hot water inlet cold water inlet cold water in hot water fr...

Page 20: ...roprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve cold water in hot water from water tank cold water inlet mixed hot water i...

Page 21: ...effective Limestone if cream cleanser is not enough treat scale with a 25 solution of vinegar and mild hot water and give it some time to dissolve Then clean with if possible deionised mild water and...

Reviews: