background image

2021-11

1 866 907 0122     blubathworks.com

 1

 1

Attention — Before Installation

If you are installing this product in a new construction or remodel, please make sure you are following all local plumbing and building codes. 

please read these instructions carefully before you begin.

- Make sure the system is clear of any impurities.

- In presence of hard water (>12°F) a water softener is advised.

Operation Conditions

- Tapware is manufactured following the EN817 norms.
- Heaters allowed upstream: pressure accumulators, instant boilers.
- The installation with low pressure hot water accumulators is not permitted (open circuits).
- Left connection. Hot water - Female NPT 3/8. (1/2” and 9”16 for some countries)
- Right connection. Cold water - Male  NPT 3/8. (1/2” and 9”16 for some countries)
- System pressure: Min./Max. 7 PSI/145 PSI.
- Recommended operating radius: 15 PSI - 72 PSI.
- For higher pressures (>72 PSI) a reducer is advised.
- Avoid pressure unbalance higher than 1:2 between hot and cold water supply.
- Recommended water supply temperature: Cold 10-15° C / 50-59° F. Hot 60-65° C / 140-149° F.

Technical Details

Minimum Pressure: 15 PSI
Maximum Pressure: 145 PSI
Recommended Pressure: 29 - 72 PSI
Maximum Water Temperature: 80° C / 176° F
Maximum Recommended Water Temperature: 65˚ C / 149˚ F

the temperature.

Installation Requirements

1. To ensure this product is installed properly, you must read and follow these guidelines.
2. The owner/user of the product must keep this information for future reference.
3. Consult local building codes to make sure the installation complies with standards.
4.  Remove the unit from its packaging. Before disposing of it, inspect the unit to make sure its in good shape. Should inspection reveal any 

installed. Blu Bathworks’ responsibility for shipping damages ceases upon delivery of the product in good order to the carrier.  
All complaints regarding damage due to transport must be made directly to the carrier.

5. Place the unit in the bathroom before you start working. Conserve all nuts and bolts.
6.  To protect the unit during installation, we recommend that you lay a piece of cardboard on the bottom.
7.  

 

8.   Verify that all dimensions on the plan are the same as the ones of the unit.
9. All installations must conform to local and national plumbing, build
10.  Inspect this product to assure you have all parts required for proper installation.

Summary of Contents for INOX QRI-0030

Page 1: ...INOX wall mount shower rough in valve kit Installation Guide 2021 11 1 866 907 0122 blubathworks com QRI 0001 Pages 4 8 QRI 0030 QRI 0910 Pages 9 15 QRI 0103 x2 Page 16...

Page 2: ...Details Minimum Pressure 15 PSI Maximum Pressure 145 PSI Recommended Pressure 29 72 PSI Maximum Water Temperature 80 C 176 F Maximum Recommended Water Temperature 65 C 149 F the temperature Installat...

Page 3: ...r mix or combine cleaning agents Abrasive cleaners and unsuitable scouring agents such as scouring pads Installation Notes Important Install this product according to the installation guide Our produc...

Page 4: ...water inlet mixed hot water inlet hot water from water tank 1 2 3 3 Component Diagram for QRI 0030 rough in valve kit 1 QRI 0001 single handle hydroprogressive wall rough in valve 2 QRI 0910 thermosta...

Page 5: ...2021 11 1 866 907 0122 blubathworks com 4 Attention Min Max depth in wall QRI 0001 rough in valve...

Page 6: ...2021 11 1 866 907 0122 blubathworks com 5 Attention Placement in wall QRI 0001 rough in valve...

Page 7: ...2021 11 1 866 907 0122 blubathworks com 6 Position Application on plasterboard or counterframe Finish the coating close to the edge of the plastic protective cover QRI 0001 rough in valve...

Page 8: ...2021 11 1 866 907 0122 blubathworks com 7 Installation wall mount single handle with spout configuration VALVE 02 MODO STERO SERIES Universal Position QRI 0001 rough in valve...

Page 9: ...2021 11 1 866 907 0122 blubathworks com 8 QRI 0001...

Page 10: ...Tampering with limit stop in any way may result in scalding temperature causing serious bodily harm and or death Warning Need for Periodic Inspection and Yearly Maintenance Periodic inspection and ye...

Page 11: ...nuts are placed over tailpieces prior to soldering threading to pipe or using w press 6 For valves with Quick Connect tailpieces refer to Quick Connect Installation instructions page 13 NOTICE To prev...

Page 12: ...2021 11 1 866 907 0122 blubathworks com 11 QRI 0910 Thermostatic Mixing Valve...

Page 13: ...he mixed water outlet temperature by placing a thermometer in the mixed water stream 3 To adjust the setting of the valve loosen locking cap screw with hex wrench refer to Figure 3 Cap must be lifted...

Page 14: ...2021 11 1 866 907 0122 blubathworks com 13 QRI 0910 Thermostatic Mixing Valve QUICK CONNECT INSTALLATION...

Page 15: ...2021 11 1 866 907 0122 blubathworks com 14 QRI 0910 Thermostatic Mixing Valve...

Page 16: ...2021 11 1 866 907 0122 blubathworks com 15 QRI 0910...

Page 17: ...1 1 866 907 0122 blubathworks com 16 QRI 0103 Shut Off Valve 1 Body 2 Retainer 3 Ball 4 Check valve insert 5 Stem 6 Gland nut 7 Lever and grip 8 Lever nut 9 O ring 10 Seat 2 12 Stem packing 13 Stem be...

Page 18: ...roprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve cold water in outlet one outlet two cold water inlet mixed hot water inlet...

Page 19: ...andle hydroprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve mixed hot water inlet cold water inlet cold water in hot water fr...

Page 20: ...roprogressive wall rough in valve 2 QRI 0910 thermostatic mixing valve 3 QRI 0103 x 2 qty shut offs with integral check valve cold water in hot water from water tank cold water inlet mixed hot water i...

Page 21: ...effective Limestone if cream cleanser is not enough treat scale with a 25 solution of vinegar and mild hot water and give it some time to dissolve Then clean with if possible deionised mild water and...

Reviews: