background image

671EX  p/n 2M-76624  9221EX Dual Satellite Owmers Manual

11

CLEANING INSTRUCTIONS (continued)

PROCEDURE:  Clean Satellite

PRECAUTIONS:    Drain Satellite before Cleaning

FREQUENCY:    Twice Weekly

TOOLS:   

Sight Glass Brush, Sanitizer

 

Soft Clean Cloth,  Bucket

1.  Remove and drain satellites.  Remove lids.
2.  Place 1 packet of Sanitizer into 2-1/2 gallons of warm tap 

water.  Pour approximately 1 gallon of sanitizer solution 

into each satellite.  Allow to stand for 2 minutes.

3.  Drain sanitizer solution from satellite into the bucket.
4.  Disassemble faucet.  Brush clean with sanitizer solution.

 

Reassemble faucet.

5.  If necessary, disassemble and clean sight glass.
 

a.  Push down on ears on sight glass guard .  Then, pull  

 

ears forward.  Lift guard off of retaining clip.

 

b.  Remove sight glass tube from silicone elbow.  

 

 

Run the sight glass brush through the tube at least

 

 

ten times.

 

c.  Reassemble the tube to the silicone elbow.  

 

 

Be sure the elbow has not been pulled from the 

 

 

satellite body.

 

d.  Reinstall the sight glass guard.

6.  Reinstall lids.  Install satellites on brewer.
7.  Rinse satellites:  With an empty brew chamber in place, 

press the BREW key and run 1 full cycle into each 

satellite. 

8.  Drain water from satellites.

Procedure is complete

CAUTION:
Burn Hazard

Brewing and serving 

temperatures of coffee are 

extremely hot.
Hot coffee will cause serious 

skin burns.

IMPORTANT:

DO NOT submerge satellite in 

water.

IMPORTANT:

DO NOT use steel wool, sharp 

objects, or caustic, abrasive or 

chlorinated cleansers to clean 

the satellites.

Sight Glass

Summary of Contents for 9221EX

Page 1: ...OMFIELD INDUSTRIES p n 2M 76624 Rev C M671EX 120813 671EX OWNERS MANUAL for SS2 SERIES DUAL SATELLITE COFFEE BREWERS with ELECTRO MECHANICAL CONTROL and EXTERNALLY HEATED SATELLITE SERVERS MODEL 9221E...

Page 2: ...a 30 day parts warranty only b dispensers i e tea and coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESS...

Page 3: ...T xi SPECIFICATIONS 1 FEATURES OPERATING CONTROLS 2 PRECAUTIONS GENERAL INFORMATION 4 AGENCY APPROVAL INFORMATION 4 INSTALLATION 5 OPERATION 7 CLEANING INSTRUCTIONS 10 PROGRAMMING INSTRUCTIONS 12 TROU...

Page 4: ...SWITCH BYPASS NOZZLE LEFT BREWING CONTROLS ADJUSTABLE LEG BREW CHAMBER IN POSITION SATELLITE IN POSITION POWER SWITCH located on back CONTROL PANEL see below READY TO BREW INDICATOR CONTROL PANEL FUSE...

Page 5: ...dispensed here Lists manufacturer model and serial number Also lists voltage and wattage rating of brewer Glows when the tank water is up to temperature Located on lower right rear of brewer Turns ma...

Page 6: ...wiring Any procedure which requires the use of tools must be performed by a qualified technician This manual is considered to be a permanent part of the appliance This manual and all supplied instruc...

Page 7: ...iameter copper tubing for installations of 12 4 meters or less and not less than 3 8 10 mm I d copper tubing for installations exceeding 12 4 meters Brewer must be connected to a COLD water line NOTE...

Page 8: ...ation close proximity to the appliance by a licensed electrician Refer to General Layout Data sheet for electrical ratings SUPPLY CORDS Power supply cords should be oil resistant sheathed flexible cab...

Page 9: ...plumbing connections are secure and leak proof 1 CHECK BREWER FOR PROPER CONFIGURATION Make sure spray disk gaskets are in place INSIDE of spray heads Make sure spray disks are properly installed Che...

Page 10: ...erly installed Verify that the gaskets are properly installed inside the spray heads Check the brew chambers Check that the brew chamber is clean Check that the bypass diverters are properly installed...

Page 11: ...lume Press VOLUME SELECT switch to 1 GAL or 1 1 2 GAL Start the Brew Press either the right or left START BREW key NOTE The brew can be cancelled at any time by pressing the BREW STOP key At the end o...

Page 12: ...ets from spray heads 5 Wipe inside of spray head and area around spray head with a soft clean cloth or sponge moistened with clean water 6 Wash spray disks in a sink using warm water and a mild deterg...

Page 13: ...n on ears on sight glass guard Then pull ears forward Lift guard off of retaining clip b Remove sight glass tube from silicone elbow Run the sight glass brush through the tube at least ten times c Rea...

Page 14: ...ly 2 Remove the brewer top panel then remove the tank lid assembly Do not disconnect the tank assembly at this time 3 Siphon all water from the hot water tank 4 Mix 10 gallons of deliming solution acc...

Page 15: ...up Reinstall gaskets and spray disks 13 Reconnect brewer to electrical supply 14 Install the brew chamber without filter paper or grounds 15 Place an empty satellite under the brew chamber Run at leas...

Page 16: ...r other container to calibrate volume 1 Press HEATER ON OFF switch to OFF Turn POWER switch on back of brewer OFF 2 Remove TOP PANEL Operating controls are accessible through the top panel only 3 Adju...

Page 17: ...he top panel only 3 Remove one of the plugs in the tank cover and insert a thermometer of known accuracy 4 Locate the CONTROL THERMOSTAT on the right side of the top housing Turn CLOCKWISE to increase...

Page 18: ...ermostat Brew chamber overflows Too many paper filters or wrong filter used Use one genuine Bloomfield paper filter per brew Chamber discharge hole plugged Clean brew chamber Timer not set properly Se...

Page 19: ...FAUCET GUARD 4 2U 76577 1 FAUCET SHANK ASY 4 1 2V Z15411 1 FAUCET ESP ULTEM HI TEMP 4 2 2U 71460 1 SEAT CUP TEA DISP FAUCET 4 3 WS 84393 1 HANDLE FAUCET 4 4 2C 84393 1 HEX NUT SPOUT VALVE 4 5 2C H201...

Page 20: ...IOR COMPONENTS 18 IL2520 Rev 8 10 12 47 51 50 3 49 48 44 13 14 34 26 18 34 32 34 25 34 34 27 31 8 11 2 33 45 29 43 12 5 15 16 1 34 28 20 22 23 19 17 30 41 21 10 21 53 34 54 2 PL 9 34 52 2 PL 4 24 46 6...

Page 21: ...24 2E 72936 SWITCH ROCKER ON OFF 125 1 25 D7 76573 HOUSING LOWER 1 26 D7 76589 COVER TOP HOUSING 1 27 D7 76587 PANEL FRONT 1 28 D7 76626 PLATE BOTTOM ASSY 1 29 D7 76625 BASE WRAP 1 30 2P 75123 TIMER...

Page 22: ...Manual EXPLODED VIEW INTERIOR COMPONENTS 20 17 23 2 35 13 11 12 32 2 5 21 24 10 28 19 33 34 35 36 37 43 38 39 26 15 27 29 30 31 39 42 40 4 41 22 MODEL 9221EX EXPLODED VIEW Part 2 8 3 18 2 19 7 16 18 1...

Page 23: ...RAY HEAD 2 3 8 LG 4 20 A6 73537 TUBE SIL 312 ID X 9 LG 1 21 2V 74619 VALVE ADJUST WATER OUTLET 2 22 2C 72148 WASHER LOCK 1 2 ID INT SE 1 23 2C 35485 NUT 1 4 20 HEX FINISHED S 4 24 2C 76007 SCREW 8AX1...

Page 24: ...ACK BLACK 22 35 BLACK WHITE BLUE 25 WHITE 20 WHITE 20 RED 18 WHITE 14 WHITE 38 RIGHT DUMP VALVE LEFT DUMP VALVE HTG ELEMENT 230V 6000W 1 2 3 4 N L3 L2 L1 HI LIMIT THERMOSTAT THERMOSTAT R STOP BREW SWI...

Page 25: ...ypass channel The remainder of the brew water is discharged through the SPRAY DISK and flows over the grounds in the brew basket Each half of the brewer is independently controlled HOT WATER FAUCET Th...

Page 26: ...671EX p n 2M 76624 9221EX Dual Satellite Owmers Manual NOTES...

Page 27: ...671EX p n 2M 76624 9221EX Dual Satellite Owmers Manual NOTES...

Page 28: ...10 Sunnen Drive St Louis MO 63143 telephone 314 678 6336 fax 314 781 2714 www wellsbloomfield com...

Reviews: