OM-KLT-E 7
Now that the kettle has been installed, you should test it to ensure that the unit is
operating correctly.
. DIRECT SKIN CONTACT
1.
Remove all literature and packing materials from inside and outside of the unit.
2.
If the unit is equipped with a draw-off valve (product outlet, clean out any
material which might clog or damage the draw-off.
3.
Confirm that the tilting mechanism is operating properly by tilting the kettle
through its full range. Then return the kettle to the upright position.
4.
Turn on the electrical service to the unit.
5.
Pour 1-2 quarts of water into the kettle.
6.
Following “To Start Kettle” instructions in the “Operator” section of this
manual, begin heating the water at the highest thermostat setting. The heating
indicator light should come on immediately, and heating should continue until
the water boils.
7.
To shut down the unit, turn the thermostat dial to “OFF”.
If the unit functions as described above, it is ready for use. If the unit does not
function as described, contact your local Certified Service Agency.
Initial Start-Up
IMPORTANT
BE SURE ALL OPERATORS READ,
UNDERSTAND AND FOLLOW THE
OPERATING INSTRUCTIONS, CAUTIONS
AND SAFETY INSTRUCTIONS CONTAINED
IN THIS MANUAL.
WARNING
AVOID ALL DIRECT CONTACT WITH HOT
SURFACES. DIRECT SKIN CONTACT COULD
RESULT IN SEVERE BURNS.
AVOID ALL DIRECT CONTACT WITH HOT
FOOD OR WATER IN THE KETTLE. DIRECT
CONTACT COULD RESULT IN SEVERE
BURNS.
PROPER
WATER LEVEL
Each day, confirm the jacket water
level by checking the water gauge.
Summary of Contents for KLT-E Series
Page 19: ...OM KLT E 17 Parts List...
Page 20: ...18 OM KLT E Parts List...
Page 22: ...20 OM KLT E Wiring Diagram...