There will be 1 or 2 cable pass-through holes in the back of the table to run the controller cords through. If you are using the
Dual Element Controller it is possible for all four cables to fit through a single grommet.
Step 1:
Remove Grommet.
Step 2:
One cable at a time, route cables through the table and grommet.
Step 3:
Re-install grommet into table. (See images below.)
Step 4:
Plug the 115V extension cable(s) into the outlet under the table. Plug the BrewCommander
™
into the extension cord.
5
3
4
2
1
*Pictures shown for 55 gallon
systems only . All other systems will
have 2 cables running through the
grommet.
Installing the BrewCommander
™
Mount the Quick Release plate to the table using the hardware provided.
(Figure 2)
Installing the Therminator™
Figure 2
Summary of Contents for 1BBL
Page 8: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 8 ...
Page 9: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 9 ...
Page 10: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 10 ...
Page 12: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 12 ...
Page 13: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 13 ...
Page 14: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 14 ...
Page 16: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 16 ...
Page 17: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 17 ...