
Electric Pilot System V5
© Blichmann Engineering, LLC 2019
2
Step 1:
Set the table top upside down on the floor.
Step 2:
There will be either 4 or 6 slots for legs on your table. Loosen all lock screws on the table and shelf. Set all legs in place
and leave all set screws loose.
Step 3:
Slide the shelf upside down onto the legs until the leg extends through the shelf bracket about 1 to
1 1/2 inches and tighten all set screws with the included allen wrench.
Step 4:
Once the shelf and the set screws are tight, it’s time to install the casters. The caster has a bolt running through it with a
rubber outer casing. When the bolt is tightened the rubber will expand. Once the caster is placed into the leg, tighten the caster
bolt to insure its securely in place. Flip the table over onto the casters.
System Size
240v 30 Amp GFCI
L6-30R Outlet
120v 15 Amp
GFCI Outlet
5
2
1
10
2
1
15
2
1
20
2
1
1BBl
4
1
20 Gal BrewEasy™
1
1
1 BBL BrewEasy™
2
1
Electrical Requirements
Remove the faceplate from the receptacle box. Locate the studs on the bottom of the table and install the receptacle box to the
table using the fasteners on the studs. Reinstall the receptacle cover.
Receptacle Box Assembly
Before continuing install the following items into your
BoilerMaker™ kettles:
AutoSparge™
False Bottom
Temperature Sensors
• HERMS: Hot Liquor Tank (HLT) and Boil Kettle (BK)
• RIMS: HLT and Sensor Fitting on RIMS Rocket
BrewMometer™
•HERMS: Mash Tun (MT)
•RIMS: BK
Whirlpool Kits
• HERMS: HLT and BK
• RIMS: BK
BoilCoil™ Heating Elements
• HLT, BK, and RIMS Rocket (if applicable)
Table Assembly
Summary of Contents for 1BBL
Page 8: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 8 ...
Page 9: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 9 ...
Page 10: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 10 ...
Page 12: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 12 ...
Page 13: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 13 ...
Page 14: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 14 ...
Page 16: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 16 ...
Page 17: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 17 ...