BLAUBERG Ventilatoren Axis-F 200 2E User Manual Download Page 2

www.blaubergventilatoren.de

axis-Q / axis-Qr / axis-f / axis-Qa / axis-Qra / tubo-f / tubo-M(Z) / tubo-Ma(Z)

2

UNIT INSTALLATION AND OPERATION SAFETY PRECAUTIONS

•  Disconnect the unit from power mains prior 

to any installation operations.

•  Unpack the unit with care.

•  The unit must be grounded!

•  While installing the unit, follow the safety 

regulations specific to the use of electric 
tools.

SAFETY REQUIREMENTS

•  Please read the user’s manual carefully prior to installing and operating the unit.
•  All user’s manual requirements as well as the provisions of all the applicable local and national construction, electrical, and technical 

norms and standards must be observed when installing and operating the unit.

•  The warnings contained in the user’s manual must be considered most seriously since they contain vital personal safety 

information.

•  Failure to follow the rules and safety precautions noted in this user’s manual may result in an injury or unit damage.
•  After a careful reading of the manual, keep it for the entire service life of the unit.
•  While transferring the unit control, the user’s manual must be turned over to the receiving operator.

This user’s manual is a main operating document intended for technical, maintenance, and operating staff.
The manual contains information about purpose, technical details, operating principle, design, and installation of the 
Axis-Q / Axis-QR / Axis-F / Axis-QA / Axis-QRA / Tubo-F / Tubo-M(Z) / Tubo-MA(Z) unit  and all its modifications.
Technical and maintenance staff must have theoretical and practical training in the field of ventilation systems and should be able to 
work in accordance with workplace safety rules as well as construction norms and standards applicable in the territory of the country.
The information in this user’s manual is correct at the time of the document’s preparation.
The Company reserves the right to modify the technical characteristics, design, or configuration of its products at any time in order to 
incorporate the latest technological developments.
No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means in any information 
search system or translated into any language in any form without the prior written permission of the Company.

Safety requirements ..................................................................................................................................................................... 2
Purpose ................................................................................................................................................................................................ 4
Delivery set ........................................................................................................................................................................................ 4
Designation key .............................................................................................................................................................................. 4
Technical data .................................................................................................................................................................................. 5
Unit design and operating principle ................................................................................................................................. 10
Mounting and set-up .................................................................................................................................................................. 11
Connection to power mains .................................................................................................................................................. 16
Technical maintenance .............................................................................................................................................................. 19
Troubleshooting ............................................................................................................................................................................. 21
Storage and transportation regulations .......................................................................................................................... 21
Manufacturer’s warranty ........................................................................................................................................................... 22
Certificate of acceptance .......................................................................................................................................................... 23
Seller information .......................................................................................................................................................................... 23
Installation certificate .................................................................................................................................................................. 23
Warranty card ................................................................................................................................................................................... 23

CONTENTS

Summary of Contents for Axis-F 200 2E

Page 1: ...Industrial electric axial fans EN USER S MANUAL Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z...

Page 2: ...rating staff The manual contains information about purpose technical details operating principle design and installation of the Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z unit an...

Page 3: ...h the unit with water Protect the electric parts of the unit against ingress of water Do not allow children to operate the unit Disconnect the unit from power mains prior to any technical maintenance...

Page 4: ...D BY CHILDREN OR PERSONS WITH REDUCED PHYSICAL MENTAL OR SENSORY CAPACITIES OR THOSE WITHOUT THE APPROPRIATE TRAINING THE UNIT MUST BE INSTALLED AND CONNECTED ONLY BY PROPERLY QUALIFIED PERSONNEL AFTE...

Page 5: ...0 50 60 50 60 50 60 50 60 50 60 50 60 50 60 Power W 250 325 151 161 420 455 220 268 550 654 330 375 750 979 540 610 Current A 1 2 1 46 0 78 0 8 1 95 2 05 1 1 1 22 2 55 2 88 1 6 1 63 3 5 4 26 2 4 2 74...

Page 6: ...50 30 60 30 50 30 60 30 50 30 60 30 60 30 60 30 60 IP rating IPX4 IPX4 IPX4 IPX4 IPX4 IPX4 IPX4 IPX4 IPX4 IPX4 Motor IP rating IP24 IP24 IP24 IP24 IP24 IP24 IP44 IP44 IP44 IP44 Parameters Axis QA Axi...

Page 7: ...350 4E Axis QR 350 4D 374 442 460 9 165 7 5 Axis QR 400 4E Axis QR 400 4D 417 504 528 9 220 8 5 Axis QR 450 4E Axis QR 450 4D Axis QR 450 6E Axis QR 450 6D 465 578 607 11 230 10 0 Axis QR 500 4E Axis...

Page 8: ...1 Axis QA Model Dimensions mm Weight kg D D1 D2 d L Axis QRA 150 162 190 220 7 120 2 5 Axis QRA 200 208 270 300 7 120 2 5 Axis QRA 250 262 330 360 7 140 3 0 Axis QRA 315 312 390 420 9 170 5 1 Axis QRA...

Page 9: ...equipped with RSM Z polymer coated steel galvanized steel reducers for connection to 150 mm 200 mm and 250 mm air ducts The reducers are not included in the delivery set and must be ordered separatel...

Page 10: ...otective ground circuit Axis Q Axis QR 3 4 1 2 5 3 4 1 2 TheAxis QAandAxis QRAfansconsistofacasing1madeofpolymer coatedstainlesssteelwithasquare Axis QA orround Axis QRA flange to which the grille 2 i...

Page 11: ...and deformations Set the impeller in motion and check that it rotates freely without catching against the inlet flange and the casing Prior to powering up the fan make sure that the mains parameters...

Page 12: ...www blaubergventilatoren de Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z 12 Axis Q fan installation Axis QR fan installation...

Page 13: ...www blaubergventilatoren de Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z 13 Axis QA and Axis QRA fan installation...

Page 14: ...y so that the direction of the arrow shown on the casing matches the direction of air flow in the system The power is supplied via the remote position terminal box Tubo F andTubo MA Z fan installation...

Page 15: ...er ducts Once done the assembly is secured with clamps The power is supplied via terminal box on the fan casing The Tubo M Z delivery set includes mounting brackets for attaching the unit to the mount...

Page 16: ...ata table The recommended trip current of the circuit breaker is the next current in the standard trip current row following the maximum current of the connected unit The automatic circuit breaker is...

Page 17: ...www blaubergventilatoren de Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z 17 Axis Q and Axis QR fan connection Axis QA fan connection...

Page 18: ...www blaubergventilatoren de Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z 18 Axis F Tubo M Z Tubo MA Z fan connection Tubo F fan connection...

Page 19: ...t solution while avoiding water penetration onto the electric motor Wipe the cleaned surfaces dry To carry out technical maintenance of the Axis F Tubo M Z Tubo MA Z Tubo F fans remove the fans from t...

Page 20: ...www blaubergventilatoren de Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Z Tubo MA Z 20 Axis QA and Axis QRA technical maintenance Tubo F Tubo M Z Tubo MA Z technical maintenance...

Page 21: ...hat the air dampers and louvers are open If the malfunction is too complex to be eliminated on the spot contact the fan Seller STORAGE AND TRANSPORTATION REGULATIONS Store the unit in the manufacturer...

Page 22: ...the user s manual Contact the Seller for warranty service The manufacturer s warranty does not apply to the following cases User s failure to submit the unit with the entire delivery package as stated...

Page 23: ...TALLATION CERTIFICATE The Axis Q Axis QR Axis F Axis QA Axis QRA Tubo F Tubo M Tubo MA _____ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Compa...

Page 24: ...www blaubergventilatoren de B03EN 11...

Reviews: