![Blastrac BG-250-230 Operating Instructions Manual Download Page 30](http://html1.mh-extra.com/html/blastrac/bg-250-230/bg-250-230_operating-instructions-manual_2769688030.webp)
Operating Instructions
BG-250-230/60
Initial Operation
October 2005
5.2 Initial
operation
Handgrip and Operating lever
2
1
3
4
13
Fig. 5.1
Before Switching on the BG-250-230/60, the front part of the grinding machine must
be lifted by pushing down on the handgrip (2) and pulling back on the operating
lever (1). Pulling back on the operating lever (1) will lower the kick stand and take
the weight off the grinding disc. Be sure machine is stable prior to starting the
motor. When the machine has started, retract the kick stand and slowly lower the
disc to the work surface. Never slam the disc to the work surface; this may cause
machine damage and injury to personnel.
Kick stand in retracted position
Fig. 5.2
© Copyright Blastrac
Revision (A) 10-20-05
29