EXCEL 2000.
14
5) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot in the top of the fuselage and to
the sides and bottom of the vertical stabilizer
mounting area. Apply epoxy to the bottom and
top edges of the filler block and to the lower
hinge also. Set the stabilizer in place and re-
align. Double check all of your measurements
once more before the epoxy cures. Hold the
stabilizer in place with T-pins or masking tape
and remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the epoxy to
fully cure before proceeding.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
RUDDER CONTROL HORN
- PUSHROD INSTALLATION.
1) Locate the two nylon control horns, two
nylon control horn backplates and four M2 x
12mm machine screws.
2) Position the rudder horn on the bottom
side of rudder.
3) Using a 1.5mm drill bit and the control
horns as a guide, drill the mounting holes
through the rudder halves.
C/A glue.
Rudder control horn.
Rudder pushrod.
Rudder servo.
Rudder
pushrod.
Elevator
pushrod.
Nose gear.
2 x 16mm.