User Manual
Publication date: Feb., 2008
Revision A1
6
1-4. View of the switch
1-4-1. User Interfaces on the Front Panel (Button, LEDs and Plugs)
There are 44 TP Gigabit Ethernet ports and 4 SFP fiber ports for optional
removable modules on the front panel of the switch. LED display area, locating on
the left side of the panel, contains a Power LED, which indicates the power status
and 48 ports working status of the switch.
Fig. 1-1 Full View of the switch
Fig. 1-2 Front View of the switch
Power Indication LED
Gigabit Ethernet Port
TP Port Status Indication LEDs
RESET Button:
RESET button is used to
reset the management
system.
SFP Fiber Port
Fiber Port Status Indication LEDs
Summary of Contents for LGB1048A
Page 1: ......
Page 2: ......
Page 3: ...User s Manual 48 Port GbE L2 Managed Switch with 4 SFP Dual Media Release 1 0...
Page 7: ...v Revision History Release Date Revision 1 0 02 21 2008 A1...
Page 80: ...User Manual Publication date Feb 2008 Revision A1 72 3 6 4 Flow Fig 3 30...
Page 97: ...User Manual Publication date Feb 2008 Revision A1 89 Fig 3 46 Fig 3 47...
Page 155: ...User Manual Publication date Feb 2008 Revision A1 147 Fig 3 87...
Page 158: ...User Manual Publication date Feb 2008 Revision A1 150 TT Fig 3 89...
Page 168: ...User Manual Publication date Feb 2008 Revision A1 160 Fig 4 1 Fig 4 2...
Page 279: ......