Installation
Installation
Receiving, Unpacking, and Removing the Elite Cabinet/Rack from the Pallet
Inspect for damage and report damage if there is damage before receiving. Unpack the rack by carefully removing the corrugated
carton and corners. Avoid damaging the enclosure when removing packaging.
WARNING: Only trained service personnel should be used to remove the rack from the carton. Also be sure you have a
sufficient number of service personnel. Do not attempt to move Elite Cabinet/Racks by yourself.
WARNING: Be careful when moving racks before installation. Sudden stops and starts, excessive force, obstructed routes, and
uneven floor surfaces may cause the rack to topple over.
WARNING: Only install equipment after the Elite Cabinet/Rack has been properly secured. Do not move the Elite Cabinet/Rack
assembly while loaded.
Once in place at the desired/intended location, deploy the leveling feet for maximum stability.
Rated or maximum load capacity for the Elite Cabinet/Rack is 2000 pounds on the floor on leveling glides.
To maintain a uniform distribution of the mechanical load in the Elite Cabinet/Rack, load the heaviest equipment first
at the bottom of the Elite Cabinet/Rack and load the lighter units at the top.
Service
The Elite Cabinet/Rack should only be repaired by personnel trained by Black Box, or returned to Black Box for repair. Contact
Black Box Technical Support at 724-746-5500 or go to blackbox.com and click on “Talk to Black Box.”