8
1.877.877.2269
BLACKBOX.COM
NEED HELP?
LEAVE THE TECH TO US
LIVE 24/7
TECHNICAL
SUPPORT
1.877.877.2269
3.1 INSTALLATION
Please consider the following important points when planning the position of the Central Power Hub unit:
• The Central Power Hub main chassis occupies a single 1U (19”) rack slot and requires either one or two (when the redundancy
option is used) mains inputs.
• For devices that require a 12VDC supply, a 2m link cable (ACR1000-3PL-CBL2M) is required.
• For devices that require a 5VDC supply, a small Converter dongle (ACR1000-12V5-CBL2M) is required to be positioned close to the
device(s) being powered. See below for details.
• Consult the precautions listed within the Safety information section.
3.2 MOUNTING CONVERTER DONGLES
For each device that requires a 5VDC supply (12VDC devices require only a sim-
ple cable), a Converter dongle is required. Each converter dongle must be placed
in close proximity to the device. To assist with mounting dongles in congested
spaces, an optional elongated rack bracket is available for ServSwitch Agility
units that allows each dongle to be positioned just behind the device that it is
powering.
Insert the tabs of the dongle through the wider spaced holes of the rack bracket
and then slide the dongle back to lock it in place.
Note: The indentations on the side of the converter dongle allow it to be fixed to
other surfaces using a single plastic cable tie.
CHAPTER 3: INSTALLATION