15
FIBER LINK
Figure 3-2. Electrical Connection.
4. Seat the connector in its position in the fiber unit.
5. Plug the power supply into a suitable outlet.
3.5 System Power
Power up the peripheral equipment. You’ll need to verify system operation. You
can do this by observing video on the monitor at the receiver end, or by operating
all of the pan-tilt-zoom functions controlled by the up-the-coax data signal. If any
feature of the system does not perform as expected, refer to
Table 4-1
for a
explanation of how to diagnose system faults using the built-in LEDs.
POWER
+12~16VDC
ALARM/+5VDC
GROUND
3
2
1