16
18
17
19
16 PLASTERGUARD REPLACEMENT
Replace plasterguard (
16A
) into Valve Body and secure with Screws (
16B
).
Proceed to finish wall.
17 FINISH WALL PREPARATION
Make appropriate holes to finished wall. Price Pfister recommends that all Tub
Spout and Shower Outlet holes be 1 1/4” diameter. For center hole on plaster
wall use 4 3/4” diameter.
CAUTION:
Make sure that leak tests and flushing are performed before
preparing the finished wall.
NON STANDARD INSTALLATIONS
18 THIN WALL INSTALLATION
Knock out Center Section (
18A
) of Plaster Guard (
18B
) and remove screws
(
18D
). For installation of thin walls, use Support Plate (
18C
) in addition to
Plaster Guard (
18B
). For installation to other wall types, do not use Support
Plate (
18C
). Use of Plaster Guard (
18B
) is optional. For center hole on a thin
wall use 4” diameter.
19 REVERSED INLET LINES
If hot and cold inlets are reversed (back-to-back installation), (
19C
) unscrew the
plasterguard and bonnet assembly. Rotate the bonnet assembly (
19A
) 180°
with notch (
19B
) facing up and reassemble.
6
ENGLISH
18B
19C
16B
16A
1 1/4” Dia
1 1/4” Dia
4 3/4” Dia
4” Dia
18C
18B
18A
18C
18D
SHWR
TUB
HOT
COLD
COLD
HOT
180°
19A
19A
19B