10
11
12
10 CARTRIDGE REASSEMBLY
Once all pipe joints are soldered, reassemble the Cartridge Assembly (
10A
) and
Backup Plate (
10B
) into Valve Body (
10C
). Be sure that Notch (
10D
) from the
Bonnet (
10E
) is pointing down (For back-to-back installation see step 19).
WARNING:
When reassembling unit, be sure tabs (
10F
) from Balancing
Cartridge (
10G
) and Bonnet (
10E
) are set properly on Valve Body grooves
(
10H
).
WARNING:
When reassembling Bonnet (
10E
) and Backup Plate (
10B
),
be certain that placement of O-ring (10J) is within groove and not pinched
between backup flange (
10K
) and casting wall (
10L
). Failure to do so will
result in water leaks and damage.
11 FLUSHING
For Tub and Shower Combinations
1. Close valve by rotating stem (
11C
) clockwise.
2. Turn on Hot and Cold water supply lines.
3. Rotate stem (
11C
) counterclockwise allowing water to flow from tub spout
outlet (
11A
) until all foreign matter has cleared the line. Repeat this step in the
warm and full hot positions. Water should not be flowing from shower outlet
(
11B
) during this test. If water is flowing from shower outlet, please check your
valve to see that the casting mark “SHWR” is facing up (see step 4).
12 FLUSHING
For shower Only Installation
1. Close valve by rotating stem (
12C
) clockwise.
2. Turn on Hot and Cold water supply lines.
3. Be sure to plug Bottom Outlet with Pipe Cap or Plug (
12B
) using Thread
Sealant.
4. Rotate stem (
12C
) counterclockwise, allowing water to flow from shower
outlet (
12A
) until all foreign matter has cleared the line. Repeat this step in the
warm and full hot positions.
If water flow becomes low or no flow at all, refer to Step 20.
4
ENGLISH
11C
10D
12A
10B
10A
10J
10K
10E
10F
10G
10H
10F
10L
10A
10E
10C
10J
11B
11A
12B
12C