background image

 

WARNING! 

ELECTRICAL EQUIPMENT CHARGED WITH ELECTRICITY! 

Prior to carrying out of any actions associated with hooking up power supply wires, 

please, make sure that AIR BIO control unit (hereinafter referred to as Controller) is not 
connected to the electric power network! Assembling and connection to the electric power 
network  shall  be  done  by  the  specialist  with  the  corresponding  authority  for  this  type  of 
work. Before switching on the Controller it is required to verify grounding effectiveness of 
electric motors, the boiler as well as inspect electric wires insulation. 

Caution!  You  shall  definitely  earth  AIR  BIO  Control  unit.  The  Controller  shall  be 
connected  to  the  earth  bar  in  accordance  with  «Operating  and  Maintenance  Rules 
for Electric Installations of Consumers». 

1 INTRODUCTION 

 

1.1 Product Purpose and Delivery Set 

AIR  BIO  control  unit  is  designed  to  ensure  cost-effective  and  safe  operation  of  a 

solid  fuel  boiler  for  the  central  heating,  hot  water  supply  pump,  a  fan  and  fuel  supply 
system.  

AIR BIO delivery set includes: 
1. Network cable with plug tip 2 m long   

 

 

 

                     - 1 ea.; 

2. Wire for hooking-up the fan with connector 0,5m long                                - 1 ea.; 
3. Wire for hooking-up the pump 2m long                                                  - 2 ea.; 
4. Wire for hooking-up the unit of automatic fuel supply 2m long             - 1 ea.; 
5. Temperature sensor with connecting wire 2 m long                                 - 3 ea.; 
6. Safety appliances                                                                                        - 2 ea.; 
7. Operation Manual (passport)                                                                  - 1 ea.; 
8. Thermal protection sensor with connecting wire 2 m long                      - 1 ea.; 
9. Clamp for fastening sensors, metal                                                          - 3 ea. 
Additional options: 
10. External alarm system                                                                           - 1 ea. 

 

1.2 Installation Requirements 

Installation and adjustment of the Controller shall be carried out in the presence of 

the  qualified  specialist.  All  installation  works  associated  with  installation/removal  of  the 
unit or  electric  wiring  shall be  carried out  only  after  power  cut.  Hookup  diagram  for  the 
control unit is shown on Picture 1, Picture 2, Picture 3. 

AIR BIO Diagram 

1.

 

Network 220V

   

 

 

6.

 

Hot Water Supply Boiler Temperature Sensor

  

2

Central Heating Pump

  

 

7. Thermal Protection Sensor

 

3. Fuel Screw Feed           

 

8. Central Heating Temperature Sensor 

4. 

Hot Water Supply Boiler pump feed

  9. Screw Feeder Temperature Sensor  

5. Air Pressurization (fan feed)  

           

Summary of Contents for AIR BIO

Page 1: ...1 OPERATION MANUAL FOR AIR BIO ELECTRONIC CONTROL UNIT FOR SOLID FUEL BOILER Kharkov city...

Page 2: ...and fuel supply system AIR BIO delivery set includes 1 Network cable with plug tip 2 m long 1 ea 2 Wire for hooking up the fan with connector 0 5m long 1 ea 3 Wire for hooking up the pump 2m long 2 ea...

Page 3: ...3 Picture1 AIR BIO Hookup Diagram Picture 2 AIR BIO Hookup to Central Heating System Diagram...

Page 4: ...following advantages fuel significant saving because there is a capability to control burning intensiveness capability to adjust Hot Water Supply temperature capability to adjust Central Heating temp...

Page 5: ...nector in intended to protect the unit from short circuit Control unit screen displays the boiler operation mode When entering the MENU it displays the menu items and modes for setting up the respecti...

Page 6: ...tion time and interval time for fuel supply gear If boiler temperature is equal or higher than the preset temperature the Controller is in Standby mode Each Controller shall be adjusted individually d...

Page 7: ...in Display When supplying power and pressing Power button the Controller LCD display will show the main page User Menu with the following information STANDBY t CH XX YY t HW XY YX ZZ screw t QQ Pictur...

Page 8: ...ching off the pump check up of its operability 3 3 2 Firing ON OFF This function is intended for starting up the cold boiler When activating this function you transfer the boiler from Standby mode to...

Page 9: ...when the boiler is in the mode of gaining temperature up to the preset value Delivery time Value is set up from 1 to 250 sec Delivery time is selected in accordance with boiler capacity fuel type and...

Page 10: ...changes within the range of 30 95 b Pump Hysteresis changes within the range 1 10 3 3 7 Adjuster Menu This function allows adjusting basic parameters of the Controller s program 3 3 7 1 Screw feeder a...

Page 11: ...em 3 3 9 Boiler Hysteresis Range 1 10 You set up the value up to which heat carrier operation temperature goes down from the preset temperature whereby the Controller will transfer the boiler from Sup...

Page 12: ...temperature 45 9 Boiler hysteresis 5 5 PERFORMANCE DATA Parameter Description UoM Value 1 Power supply voltage V z 230 50 2 Max power input Watt 4 5 3 Automatic equipment operation temperature range 1...

Page 13: ...troller central heating systems shall be equipped with safety valves operating under pressure surge tanks protective systems to ensure there will be no water boiling in the central heating system it i...

Page 14: ...fire safety regulations and electrical safety requirements 2 Installation and adjustment of the Controller shall be carried out in the presence of the qualified specialist 3 It is recommended to insta...

Page 15: ...is not less than 10 years 2 LTD Bioprom Company Kharkov provides warranty for AIR BIO Controller for the period of 18 months from the date of sale but not longer than 24 months from the date of manuf...

Page 16: ...within the longer time period 9 TRANSPORTATION For the purpose of keeping maintaining the Controller integrity and proper functionality during transportation one shall follow all the transportation c...

Page 17: ...a www bioprom kh ua www bioprom ua www bioprom kharkov ua For all issues relating to warranty and post warranty service please feel free to contact us at the address of 126 1 Plekhanovskaya Str Kharko...

Page 18: ...18 For Notes...

Page 19: ...19 For Notes...

Page 20: ...oller is used in strict compliance with the manufacturer s specification Unit is checked by ______ Full Name ___________ signature Serial Number ______________________ Date Manufacturer s Signature an...

Reviews: